V. González
- Multiobjective design of Work-In-Process buffer for scheduling repetitive building projects. In: Automation in Construction, v. 18, n. 2 (March 2009). (2009):
- Application of Artificial Neural Network Methodology for Predicting Seismic Retrofit Construction Costs. In: Journal of Construction Engineering and Management, v. 140, n. 2 (February 2014). (2014):
- Predicting Seismic Retrofit Construction Cost for Buildings with Framed Structures Using Multilinear Regression Analysis. In: Journal of Construction Engineering and Management, v. 140, n. 3 (March 2014). (2014):