V. González
- Multiobjective design of Work-In-Process buffer for scheduling repetitive building projects. Dans: Automation in Construction, v. 18, n. 2 (mars 2009). (2009):
- Application of Artificial Neural Network Methodology for Predicting Seismic Retrofit Construction Costs. Dans: Journal of Construction Engineering and Management, v. 140, n. 2 (février 2014). (2014):
- Predicting Seismic Retrofit Construction Cost for Buildings with Framed Structures Using Multilinear Regression Analysis. Dans: Journal of Construction Engineering and Management, v. 140, n. 3 (mars 2014). (2014):