Colin Gleeson
- The Rasmaska project: Temperature behaviour of three, full scale test cells in hot mediterranean summer: Non-insulated double masonry wall and different insulation locations. In: Energy and Buildings, v. 178 (November 2018). (2018):
- What kind of expertise is needed for low energy construction?. In: Construction Management and Economics, v. 35, n. 3 (October 2016). (2016):