Colin Gleeson
- The Rasmaska project: Temperature behaviour of three, full scale test cells in hot mediterranean summer: Non-insulated double masonry wall and different insulation locations. Dans: Energy and Buildings, v. 178 (novembre 2018). (2018):
- What kind of expertise is needed for low energy construction?. Dans: Construction Management and Economics, v. 35, n. 3 (octobre 2016). (2016):