0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Perry Forsythe

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Jalali Yazdi, Alireza / Ahmadian Fard Fini, Alireza / Forsythe, Perry (2021): Mass-customisation of cross-laminated timber wall systems at early design stages. In: Automation in Construction, v. 132 (December 2021).

    https://doi.org/10.1016/j.autcon.2021.103938

  2. Forsythe, Perry (2018): Extending and operationalizing construction productivity measurement on building projects. In: Construction Management and Economics, v. 36, n. 12 (July 2018).

    https://doi.org/10.1080/01446193.2018.1480834

  3. Forsythe, Perry (2006): Consumer‐perceived appearance tolerances in construction quality management. In: Engineering, Construction and Architectural Management, v. 13, n. 3 (May 2006).

    https://doi.org/10.1108/09699980610669714

  4. Forsythe, Perry (2008): Modelling customer perceived service quality in housing construction. In: Engineering, Construction and Architectural Management, v. 15, n. 5 (September 2008).

    https://doi.org/10.1108/09699980810902767

  5. Loganathan, Santhosh / Forsythe, Perry (2020): Unravelling the influence of teamwork on trade crew productivity: a review and a proposed framework. In: Construction Management and Economics, v. 38, n. 11 (July 2020).

    https://doi.org/10.1080/01446193.2020.1795900

  6. Puolitaival, Taija / Forsythe, Perry (2016): Practical challenges of BIM education. In: Structural Survey, v. 34, n. 1 (August 2016).

    https://doi.org/10.1108/ss-12-2015-0053

  7. Forsythe, Perry (2017): Quantifying the recurring nature of fitout to assist LCA studies in office buildings. In: International Journal of Building Pathology and Adaptation, v. 35, n. 3 (July 2017).

    https://doi.org/10.1108/ijbpa-04-2017-0020

  8. Jalali Yazdi, Alireza / Forsythe, Perry / Ahmadian Fard Fini, Alireza / Maghrebi, Mojtaba (2019): Optimization of flexible lift processes on high-rise building construction sites. In: Automation in Construction, v. 107 (November 2019).

    https://doi.org/10.1016/j.autcon.2019.102939

  9. Forsythe, Perry (2015): Monitoring Customer Perceived Service Quality and Satisfaction during the Construction Process. In: Construction Economics and Building, v. 15, n. 1 (March 2015).

    https://doi.org/10.5130/ajceb.v15i1.4172

  10. Loganathan, Santhosh / Forsythe, Perry / Kalidindi, Satyanarayana N. (2018): Work practices of onsite construction crews and their influence on productivity. In: Construction Economics and Building, v. 18, n. 3 (October 2018).

    https://doi.org/10.5130/ajceb.v18i3.5973

  11. Ding, Grace / Forsythe, Perry (2016): A comparative study of floor construction on sloping sites: an analysis of cumulative energy demand and greenhouse gas emissions. In: Construction Economics and Building, v. 16, n. 1 (March 2016).

    https://doi.org/10.5130/ajceb.v16i1.4813

  12. Forsythe, Perry / Ding, Grace (2014): Greenhouse Gas Emissions from Excavation on Residential Construction Sites. In: Australasian Journal of Construction Economics and Building, v. 14, n. 4 (December 2014).

    https://doi.org/10.5130/ajceb.v14i4.4195

  13. Forsythe, Perry (2013): Work Integrated Learning and the Case for a "Student-Industry Network" in Undergraduate Construction Management Programs. In: Australasian Journal of Construction Economics and Building - Conference Series, v. 1, n. 1 (February 2013).

    https://doi.org/10.5130/ajceb-cs.v1i1.3150

  14. Cheng, Feifei / Li, Heng / Wang, Y.-W. / Skitmore, Martin / Forsythe, Perry (2013): Modeling resource management in the building design process by information constraint Petri nets. In: Automation in Construction, v. 29 (January 2013).

    https://doi.org/10.1016/j.autcon.2012.08.005

  15. Li, Heng / Yang, Xincong / Skitmore, Martin / Wang, Fenglai / Forsythe, Perry (2017): Automated classification of construction site hazard zones by crowd-sourced integrated density maps. In: Automation in Construction, v. 81 (September 2017).

    https://doi.org/10.1016/j.autcon.2017.04.007

  16. Naar, Liisa / Nikolova, Natalia / Forsythe, Perry (2015): Innovative construction and the role of boundary objects: a Gehry case study. In: Construction Management and Economics, v. 34, n. 10 (August 2015).

    https://doi.org/10.1080/01446193.2016.1201206

  17. Sepasgozar, Samad M. E. / Forsythe, Perry / Shirowzhan, Sara (2018): Evaluation of Terrestrial and Mobile Scanner Technologies for Part-Built Information Modeling. In: Journal of Construction Engineering and Management, v. 144, n. 12 (December 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001574

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine