0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Jalali Yazdi, Alireza / Ahmadian Fard Fini, Alireza / Forsythe, Perry (2021): Mass-customisation of cross-laminated timber wall systems at early design stages. Dans: Automation in Construction, v. 132 (décembre 2021).

    https://doi.org/10.1016/j.autcon.2021.103938

  2. Forsythe, Perry (2018): Extending and operationalizing construction productivity measurement on building projects. Dans: Construction Management and Economics, v. 36, n. 12 (juillet 2018).

    https://doi.org/10.1080/01446193.2018.1480834

  3. Forsythe, Perry (2006): Consumer‐perceived appearance tolerances in construction quality management. Dans: Engineering, Construction and Architectural Management, v. 13, n. 3 (mai 2006).

    https://doi.org/10.1108/09699980610669714

  4. Forsythe, Perry (2008): Modelling customer perceived service quality in housing construction. Dans: Engineering, Construction and Architectural Management, v. 15, n. 5 (septembre 2008).

    https://doi.org/10.1108/09699980810902767

  5. Loganathan, Santhosh / Forsythe, Perry (2020): Unravelling the influence of teamwork on trade crew productivity: a review and a proposed framework. Dans: Construction Management and Economics, v. 38, n. 11 (juillet 2020).

    https://doi.org/10.1080/01446193.2020.1795900

  6. Puolitaival, Taija / Forsythe, Perry (2016): Practical challenges of BIM education. Dans: Structural Survey, v. 34, n. 1 (août 2016).

    https://doi.org/10.1108/ss-12-2015-0053

  7. Forsythe, Perry (2017): Quantifying the recurring nature of fitout to assist LCA studies in office buildings. Dans: International Journal of Building Pathology and Adaptation, v. 35, n. 3 (juillet 2017).

    https://doi.org/10.1108/ijbpa-04-2017-0020

  8. Jalali Yazdi, Alireza / Forsythe, Perry / Ahmadian Fard Fini, Alireza / Maghrebi, Mojtaba (2019): Optimization of flexible lift processes on high-rise building construction sites. Dans: Automation in Construction, v. 107 (novembre 2019).

    https://doi.org/10.1016/j.autcon.2019.102939

  9. Forsythe, Perry (2015): Monitoring Customer Perceived Service Quality and Satisfaction during the Construction Process. Dans: Construction Economics and Building, v. 15, n. 1 (mars 2015).

    https://doi.org/10.5130/ajceb.v15i1.4172

  10. Loganathan, Santhosh / Forsythe, Perry / Kalidindi, Satyanarayana N. (2018): Work practices of onsite construction crews and their influence on productivity. Dans: Construction Economics and Building, v. 18, n. 3 (octobre 2018).

    https://doi.org/10.5130/ajceb.v18i3.5973

  11. Ding, Grace / Forsythe, Perry (2016): A comparative study of floor construction on sloping sites: an analysis of cumulative energy demand and greenhouse gas emissions. Dans: Construction Economics and Building, v. 16, n. 1 (mars 2016).

    https://doi.org/10.5130/ajceb.v16i1.4813

  12. Forsythe, Perry / Ding, Grace (2014): Greenhouse Gas Emissions from Excavation on Residential Construction Sites. Dans: Australasian Journal of Construction Economics and Building, v. 14, n. 4 (décembre 2014).

    https://doi.org/10.5130/ajceb.v14i4.4195

  13. Forsythe, Perry (2013): Work Integrated Learning and the Case for a "Student-Industry Network" in Undergraduate Construction Management Programs. Dans: Australasian Journal of Construction Economics and Building - Conference Series, v. 1, n. 1 (février 2013).

    https://doi.org/10.5130/ajceb-cs.v1i1.3150

  14. Cheng, Feifei / Li, Heng / Wang, Y.-W. / Skitmore, Martin / Forsythe, Perry (2013): Modeling resource management in the building design process by information constraint Petri nets. Dans: Automation in Construction, v. 29 (janvier 2013).

    https://doi.org/10.1016/j.autcon.2012.08.005

  15. Li, Heng / Yang, Xincong / Skitmore, Martin / Wang, Fenglai / Forsythe, Perry (2017): Automated classification of construction site hazard zones by crowd-sourced integrated density maps. Dans: Automation in Construction, v. 81 (septembre 2017).

    https://doi.org/10.1016/j.autcon.2017.04.007

  16. Naar, Liisa / Nikolova, Natalia / Forsythe, Perry (2015): Innovative construction and the role of boundary objects: a Gehry case study. Dans: Construction Management and Economics, v. 34, n. 10 (août 2015).

    https://doi.org/10.1080/01446193.2016.1201206

  17. Sepasgozar, Samad M. E. / Forsythe, Perry / Shirowzhan, Sara (2018): Evaluation of Terrestrial and Mobile Scanner Technologies for Part-Built Information Modeling. Dans: Journal of Construction Engineering and Management, v. 144, n. 12 (décembre 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001574

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine