0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Ralph D. Ellis

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Thomas, H. Randolph / Ellis, Ralph D. (2009): Judicial Reviews of Public Administrators in Awarding Contracts. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 1, n. 3 (August 2009).

    https://doi.org/10.1061/(asce)1943-4162(2009)1:3(118)

  2. Agdas, Duzgun / Ellis, Ralph D. (2013): Analysis of Construction Dispute Review Boards. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 5, n. 3 (August 2013).

    https://doi.org/10.1061/(asce)la.1943-4170.0000118

  3. Agdas, Duzgun / Washington, Simon / Ellis, Ralph D. / Agdas, Sevcan / Dickrell, Pamela (2014): Analysis of Distance Learner Value Assessment of Distance Education in Engineering. In: Journal of Professional Issues in Engineering Education and Practice, v. 140, n. 1 (January 2014).

    https://doi.org/10.1061/(asce)ei.1943-5541.0000166

  4. Ellis, Ralph D. / Pyeon, Jae-Ho / Lee, Seung-Hyun / Kim, Booil (2010): Evaluation of seal coating treatments to manage temporary pavement paint markings during highway construction. In: KSCE Journal of Civil Engineering, v. 14, n. 4 (June 2010).

    https://doi.org/10.1007/s12205-010-0461-5

  5. Minchin, R. Edward / Thurn, S. Brent / Ellis, Ralph D. / Lewis, Don W. (2013): Using Contractor Bid Amounts to Estimate the Impact of Night Construction on Cost for Transportation Construction. In: Journal of Construction Engineering and Management, v. 139, n. 8 (August 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000688

  6. Kim, Jin-Lee / Ellis, Ralph D. (2008): Permutation-Based Elitist Genetic Algorithm for Optimization of Large-Sized Resource-Constrained Project Scheduling. In: Journal of Construction Engineering and Management, v. 134, n. 11 (November 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:11(904)

  7. Kim, Jin-Lee / Ellis, Ralph D. (2010): Comparing Schedule Generation Schemes in Resource-Constrained Project Scheduling Using Elitist Genetic Algorithm. In: Journal of Construction Engineering and Management, v. 136, n. 2 (February 2010).

    https://doi.org/10.1061/(asce)0733-9364(2010)136:2(160)

  8. Ellis, Ralph D. / Lee, Seung-Hyun (2006): Measuring Project Level Productivity on Transportation Projects. In: Journal of Construction Engineering and Management, v. 132, n. 3 (March 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:3(314)

  9. Thomas, H. Randolph / Ellis, Ralph D. (2007): Contractor Prebid Planning Principles. In: Journal of Construction Engineering and Management, v. 133, n. 8 (August 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:8(542)

  10. Agdas, Duzgun / Ellis, Ralph D. (2010): The potential of XML technology as an answer to the data interchange problems of the construction industry. In: Construction Management and Economics, v. 28, n. 7 (July 2010).

    https://doi.org/10.1080/01446191003767503

  11. Kim, Jin-Lee / Ellis, Ralph D. (2009): Robust global and local search approach to resource-constrained project scheduling. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 3 (March 2009).

    https://doi.org/10.1139/l08-135

  12. Thomas, H. Randolph / Ellis, Ralph D. (2009): Fundamental Principles of Weather Mitigation. In: Practice Periodical on Structural Design and Construction, v. 14, n. 1 (February 2009).

    https://doi.org/10.1061/(asce)1084-0680(2009)14:1(29)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine