La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Thomas, H. Randolph / Ellis, Ralph D. (2009): Judicial Reviews of Public Administrators in Awarding Contracts. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 1, n. 3 (août 2009).

    https://doi.org/10.1061/(asce)1943-4162(2009)1:3(118)

  2. Agdas, Duzgun / Ellis, Ralph D. (2013): Analysis of Construction Dispute Review Boards. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 5, n. 3 (août 2013).

    https://doi.org/10.1061/(asce)la.1943-4170.0000118

  3. Agdas, Duzgun / Washington, Simon / Ellis, Ralph D. / Agdas, Sevcan / Dickrell, Pamela (2014): Analysis of Distance Learner Value Assessment of Distance Education in Engineering. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 140, n. 1 (janvier 2014).

    https://doi.org/10.1061/(asce)ei.1943-5541.0000166

  4. Ellis, Ralph D. / Pyeon, Jae-Ho / Lee, Seung-Hyun / Kim, Booil (2010): Evaluation of seal coating treatments to manage temporary pavement paint markings during highway construction. Dans: KSCE Journal of Civil Engineering, v. 14, n. 4 (juin 2010).

    https://doi.org/10.1007/s12205-010-0461-5

  5. Minchin, R. Edward / Thurn, S. Brent / Ellis, Ralph D. / Lewis, Don W. (2013): Using Contractor Bid Amounts to Estimate the Impact of Night Construction on Cost for Transportation Construction. Dans: Journal of Construction Engineering and Management, v. 139, n. 8 (août 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000688

  6. Kim, Jin-Lee / Ellis, Ralph D. (2008): Permutation-Based Elitist Genetic Algorithm for Optimization of Large-Sized Resource-Constrained Project Scheduling. Dans: Journal of Construction Engineering and Management, v. 134, n. 11 (novembre 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:11(904)

  7. Kim, Jin-Lee / Ellis, Ralph D. (2010): Comparing Schedule Generation Schemes in Resource-Constrained Project Scheduling Using Elitist Genetic Algorithm. Dans: Journal of Construction Engineering and Management, v. 136, n. 2 (février 2010).

    https://doi.org/10.1061/(asce)0733-9364(2010)136:2(160)

  8. Ellis, Ralph D. / Lee, Seung-Hyun (2006): Measuring Project Level Productivity on Transportation Projects. Dans: Journal of Construction Engineering and Management, v. 132, n. 3 (mars 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:3(314)

  9. Thomas, H. Randolph / Ellis, Ralph D. (2007): Contractor Prebid Planning Principles. Dans: Journal of Construction Engineering and Management, v. 133, n. 8 (août 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:8(542)

  10. Agdas, Duzgun / Ellis, Ralph D. (2010): The potential of XML technology as an answer to the data interchange problems of the construction industry. Dans: Construction Management and Economics, v. 28, n. 7 (juillet 2010).

    https://doi.org/10.1080/01446191003767503

  11. Kim, Jin-Lee / Ellis, Ralph D. (2009): Robust global and local search approach to resource-constrained project scheduling. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 3 (mars 2009).

    https://doi.org/10.1139/l08-135

  12. Thomas, H. Randolph / Ellis, Ralph D. (2009): Fundamental Principles of Weather Mitigation. Dans: Practice Periodical on Structural Design and Construction, v. 14, n. 1 (février 2009).

    https://doi.org/10.1061/(asce)1084-0680(2009)14:1(29)

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine