0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Emad Elbeltagi ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Elnabwy, Mohamed T. / Khalaf, Diaa / Mlybari, Ehab A. / Elbeltagi, Emad: An integrated machine learning approach for evaluating critical success factors influencing project portfolio management adoption in the construction industry. In: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-05-2024-0537

  2. Salem, Mohamed / Al-Sabah, Ruqaya S. / Elnabwy, Mohamed T. / Elbeltagi, Emad / Tantawy, Mohamed (2024): Critical Success Factors for the Widespread Adoption of Virtual Alternative Dispute Resolution (VADR) in the Construction Industry: A Structural Equation Modeling Analysis. In: Buildings, v. 14, n. 9 (25 August 2024).

    https://doi.org/10.3390/buildings14093033

  3. Allam, Alaa / Elbeltagi, Emad / Abouelsaad, Mohamed Naguib / El Madawy, Mohamed E.: Integrated BIM-GA approach for slab formwork design optimization. In: Construction Innovation.

    https://doi.org/10.1108/ci-12-2023-0317

  4. Wefki, Hossam / Salah, Mona / Elbeltagi, Emad / Elsheikh, Asser / Khallaf, Rana: A generative design-based optimization model for multi-objective construction site layout planning. In: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-11-2023-1193

  5. Elnabwy, Mohamed T. / Elbeltagi, Emad / El Banna, Mahmoud M. / Alshahri, Abdullah H. / Hu, Jong Wan / Choi, Byoung Gil / Kwon, Yong Hee / Kaloop, Mosbeh R. (2024): Harbor Sedimentation Management Using Numerical Modeling and Exploratory Data Analysis. In: Advances in Civil Engineering, v. 2024 (January 2024).

    https://doi.org/10.1155/2024/1209460

  6. Wefki, Hossam / Elnahla, Mohamed / Elbeltagi, Emad (2024): BIM-based schedule generation and optimization using genetic algorithms. In: Automation in Construction, v. 164 (August 2024).

    https://doi.org/10.1016/j.autcon.2024.105476

  7. Ghaly, Monica / Elbeltagi, Emad / Elsmadony, Adel / Tantawy, Mohamed A. (2024): Integration of Blockchain-Enabled Smart Contracts in Construction: SWOT Framework and Social Network Analysis. In: Civil Engineering Journal, v. 10, n. 5 (1 May 2024).

    https://doi.org/10.28991/cej-2024-010-05-020

  8. Hegazy, Tarek / Elbeltagi, Emad / El-Behairy, Hatem (2004): Bridge Deck Management System with Integrated Life-Cycle Cost Optimization. In: Transportation Research Record: Journal of the Transportation Research Board, v. 1866, n. 1 (January 2004).

    https://doi.org/10.3141/1866-06

  9. El Hakea, Ayman H. / Sami, Mahmoud / Badawy, Abdelhay / Elbeltagi, Emad / Hosny, Ossama / Iskander, Moheb / Abu-Samra, Soliman (2024): Risk-Based Self-Improving Asset Management Framework for Coastal Protection Structures Using 1+ Inspection Points. In: Journal of Performance of Constructed Facilities (ASCE), v. 38, n. 3 (June 2024).

    https://doi.org/10.1061/jpcfev.cfeng-4633

  10. Kosbar, Mohamed M. / Elbeltagi, Emad / Mahdi, Ibrahim / Kassem, Mahmoud / Ehab, A. (2023): Off-Site Manufacturing: Determining Decision-Making Factors. In: Buildings, v. 13, n. 11 (26 October 2023).

    https://doi.org/10.3390/buildings13112856

  11. Salah, Mona / Khallaf, Rana / Elbeltagi, Emad / Wefki, Hossam (2023): Construction Site Layout Planning: A Social Network Analysis. In: Buildings, v. 13, n. 10 (10 October 2023).

    https://doi.org/10.3390/buildings13102637

  12. Amien, Doaa H. / Elbeltagi, Emad / Mashhour, Ibrahim M. / Ehab, Ahmed (2023): Impact of COVID-19 on Construction Production Rate. In: Buildings, v. 13, n. 5 (27 April 2023).

    https://doi.org/10.3390/buildings13051127

  13. Altassan, Abdulrahman / Othman, Mahmoud / Elbeltagi, Emad / Abdelshakor, Mohammed / Ehab, A. (2023): A Qualitative Investigation of the Obstacles Inherent in the Implementation of Building Information Modeling (BIM). In: Buildings, v. 13, n. 3 (26 February 2023).

    https://doi.org/10.3390/buildings13030700

  14. Eissa, Radwa / Eid, Mohamed S. / Elbeltagi, Emad (2021): Current Applications of Game Theory in Construction Engineering and Management Research: A Social Network Analysis Approach. In: Journal of Construction Engineering and Management, v. 147, n. 7 (July 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002085

  15. Eissa, Radwa / Eid, Mohamed S. / Elbeltagi, Emad (2021): Conceptual Profit Allocation Framework for Construction Joint Ventures: Shapley Value Approach. In: Journal of Management in Engineering (ASCE), v. 37, n. 3 (May 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000911

  16. Elbeltagi, Emad / Ammar, Mohammed / Sanad, Haytham / Kassab, Moustafa (2016): Overall multiobjective optimization of construction projects scheduling using particle swarm. In: Engineering, Construction and Architectural Management, v. 23, n. 3 (May 2016).

    https://doi.org/10.1108/ecam-11-2014-0135

  17. Attalla, Mohamed / Hegazy, Tarek / Elbeltagi, Emad (2004): In-House Delivery of Multiple-Small Reconstruction Projects. In: Journal of Management in Engineering (ASCE), v. 20, n. 1 (January 2004).

    https://doi.org/10.1061/(asce)0742-597x(2004)20:1(25)

  18. Sakla, Sherief S. S. / Elbeltagi, Emad (2003): Design of steel roofs subjected to drifted snow using genetic optimization. In: Computers & Structures, v. 81, n. 6 (March 2003).

    https://doi.org/10.1016/s0045-7949(03)00017-8

  19. El-Ghandour, Hamdy A. / Elbeltagi, Emad (2018): Comparison of Five Evolutionary Algorithms for Optimization of Water Distribution Networks. In: Journal of Computing in Civil Engineering, v. 32, n. 1 (January 2018).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000717

  20. Hegazy, Tarek / Elbeltagi, Emad (1999): EvoSite: Evolution-Based Model for Site Layout Planning. In: Journal of Computing in Civil Engineering, v. 13, n. 3 (July 1999).

    https://doi.org/10.1061/(asce)0887-3801(1999)13:3(198)

  21. Ammar, Mohammad A. / Elbeltagi, Emad (2001): Algorithm for Determining Controlling Path Considering Resource Continuity. In: Journal of Computing in Civil Engineering, v. 15, n. 4 (October 2001).

    https://doi.org/10.1061/(asce)0887-3801(2001)15:4(292)

  22. Hegazy, Tarek / Shabeeb, Abdul Karim / Elbeltagi, Emad / Cheema, Tariq (2000): Algorithm for Scheduling with Multiskilled Constrained Resources. In: Journal of Construction Engineering and Management, v. 126, n. 6 (December 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:6(414)

  23. Elbeltagi, Emad / Hegazy, Tarek / Eldosouky, Adel (2004): Dynamic Layout of Construction Temporary Facilities Considering Safety. In: Journal of Construction Engineering and Management, v. 130, n. 4 (August 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:4(534)

  24. Hegazy, Tarek / Elhakeem, Ahmed / Elbeltagi, Emad (2004): Distributed Scheduling Model for Infrastructure Networks. In: Journal of Construction Engineering and Management, v. 130, n. 2 (April 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:2(160)

  25. Elbeltagi, Emad / Hegazy, Tarek (2001): A Hybrid AL-Based System for Site Layout Planning in Construction. In: Computer-Aided Civil and Infrastructure Engineering, v. 16, n. 2 (March 2001).

    https://doi.org/10.1111/0885-9507.00215

  26. Elbehairy, Hatem / Elbeltagi, Emad / Hegazy, Tarek / Soudki, Khaled (2006): Comparison of Two Evolutionary Algorithms for Optimization of Bridge Deck Repairs. In: Computer-Aided Civil and Infrastructure Engineering, v. 21, n. 8 (November 2006).

    https://doi.org/10.1111/j.1467-8667.2006.00458.x

  27. Elbeltagi, Emad / Dawood, Mahmoud (2011): Integrated visualized time control system for repetitive construction projects. In: Automation in Construction, v. 20, n. 7 (November 2011).

    https://doi.org/10.1016/j.autcon.2011.03.012

  28. Hegazy, Tarek / Elbeltagi, Emad / Zhang, Kehui (2005): Keeping Better Site Records Using Intelligent Bar Charts. In: Journal of Construction Engineering and Management, v. 131, n. 5 (May 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:5(513)

  29. Elbeltagi, Emad / Hegazy, Tarek / Grierson, Donald (2007): A modified shuffled frog-leaping optimization algorithm: applications to project management. In: Structure and Infrastructure Engineering, v. 3, n. 1 (March 2007).

    https://doi.org/10.1080/15732470500254535

  30. Kaloop, Mosbeh R. / Elbeltagi, Emad / Elnabwy, Mohamed T. (2015): Bridge Monitoring with Wavelet Principal Component and Spectrum Analysis Based on GPS Measurements: Case Study of the Mansoura Bridge in Egypt. In: Journal of Performance of Constructed Facilities (ASCE), v. 29, n. 3 (June 2015).

    https://doi.org/10.1061/(asce)cf.1943-5509.0000559

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine