-
Elnabwy, Mohamed T. / Khalaf, Diaa / Mlybari, Ehab A. / Elbeltagi, Emad: An integrated machine learning approach for evaluating critical success factors influencing project portfolio management adoption in the construction industry. In: Engineering, Construction and Architectural Management.
https://doi.org/10.1108/ecam-05-2024-0537
-
Salem, Mohamed / Al-Sabah, Ruqaya S. / Elnabwy, Mohamed T. / Elbeltagi, Emad / Tantawy, Mohamed (2024): Critical Success Factors for the Widespread Adoption of Virtual Alternative Dispute Resolution (VADR) in the Construction Industry: A Structural Equation Modeling Analysis. In: Buildings, v. 14, n. 9 (25 August 2024).
https://doi.org/10.3390/buildings14093033
-
Allam, Alaa / Elbeltagi, Emad / Abouelsaad, Mohamed Naguib / El Madawy, Mohamed E.: Integrated BIM-GA approach for slab formwork design optimization. In: Construction Innovation.
https://doi.org/10.1108/ci-12-2023-0317
-
Wefki, Hossam / Salah, Mona / Elbeltagi, Emad / Elsheikh, Asser / Khallaf, Rana: A generative design-based optimization model for multi-objective construction site layout planning. In: Engineering, Construction and Architectural Management.
https://doi.org/10.1108/ecam-11-2023-1193
-
Elnabwy, Mohamed T. / Elbeltagi, Emad / El Banna, Mahmoud M. / Alshahri, Abdullah H. / Hu, Jong Wan / Choi, Byoung Gil / Kwon, Yong Hee / Kaloop, Mosbeh R. (2024): Harbor Sedimentation Management Using Numerical Modeling and Exploratory Data Analysis. In: Advances in Civil Engineering, v. 2024 (January 2024).
https://doi.org/10.1155/2024/1209460
-
Wefki, Hossam / Elnahla, Mohamed / Elbeltagi, Emad (2024): BIM-based schedule generation and optimization using genetic algorithms. In: Automation in Construction, v. 164 (August 2024).
https://doi.org/10.1016/j.autcon.2024.105476
-
Ghaly, Monica / Elbeltagi, Emad / Elsmadony, Adel / Tantawy, Mohamed A. (2024): Integration of Blockchain-Enabled Smart Contracts in Construction: SWOT Framework and Social Network Analysis. In: Civil Engineering Journal, v. 10, n. 5 (1 May 2024).
https://doi.org/10.28991/cej-2024-010-05-020
-
Hegazy, Tarek / Elbeltagi, Emad / El-Behairy, Hatem (2004): Bridge Deck Management System with Integrated Life-Cycle Cost Optimization. In: Transportation Research Record: Journal of the Transportation Research Board, v. 1866, n. 1 (January 2004).
https://doi.org/10.3141/1866-06
-
El Hakea, Ayman H. / Sami, Mahmoud / Badawy, Abdelhay / Elbeltagi, Emad / Hosny, Ossama / Iskander, Moheb / Abu-Samra, Soliman (2024): Risk-Based Self-Improving Asset Management Framework for Coastal Protection Structures Using 1+ Inspection Points. In: Journal of Performance of Constructed Facilities (ASCE), v. 38, n. 3 (June 2024).
https://doi.org/10.1061/jpcfev.cfeng-4633
-
Kosbar, Mohamed M. / Elbeltagi, Emad / Mahdi, Ibrahim / Kassem, Mahmoud / Ehab, A. (2023): Off-Site Manufacturing: Determining Decision-Making Factors. In: Buildings, v. 13, n. 11 (26 October 2023).
https://doi.org/10.3390/buildings13112856
-
Salah, Mona / Khallaf, Rana / Elbeltagi, Emad / Wefki, Hossam (2023): Construction Site Layout Planning: A Social Network Analysis. In: Buildings, v. 13, n. 10 (10 October 2023).
https://doi.org/10.3390/buildings13102637
-
Amien, Doaa H. / Elbeltagi, Emad / Mashhour, Ibrahim M. / Ehab, Ahmed (2023): Impact of COVID-19 on Construction Production Rate. In: Buildings, v. 13, n. 5 (27 April 2023).
https://doi.org/10.3390/buildings13051127
-
Altassan, Abdulrahman / Othman, Mahmoud / Elbeltagi, Emad / Abdelshakor, Mohammed / Ehab, A. (2023): A Qualitative Investigation of the Obstacles Inherent in the Implementation of Building Information Modeling (BIM). In: Buildings, v. 13, n. 3 (26 February 2023).
https://doi.org/10.3390/buildings13030700
-
Eissa, Radwa / Eid, Mohamed S. / Elbeltagi, Emad (2021): Current Applications of Game Theory in Construction Engineering and Management Research: A Social Network Analysis Approach. In: Journal of Construction Engineering and Management, v. 147, n. 7 (July 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0002085
-
Eissa, Radwa / Eid, Mohamed S. / Elbeltagi, Emad (2021): Conceptual Profit Allocation Framework for Construction Joint Ventures: Shapley Value Approach. In: Journal of Management in Engineering (ASCE), v. 37, n. 3 (May 2021).
https://doi.org/10.1061/(asce)me.1943-5479.0000911
-
Elbeltagi, Emad / Ammar, Mohammed / Sanad, Haytham / Kassab, Moustafa (2016): Overall multiobjective optimization of construction projects scheduling using particle swarm. In: Engineering, Construction and Architectural Management, v. 23, n. 3 (May 2016).
https://doi.org/10.1108/ecam-11-2014-0135
-
Attalla, Mohamed / Hegazy, Tarek / Elbeltagi, Emad (2004): In-House Delivery of Multiple-Small Reconstruction Projects. In: Journal of Management in Engineering (ASCE), v. 20, n. 1 (January 2004).
https://doi.org/10.1061/(asce)0742-597x(2004)20:1(25)
-
Sakla, Sherief S. S. / Elbeltagi, Emad (2003): Design of steel roofs subjected to drifted snow using genetic optimization. In: Computers & Structures, v. 81, n. 6 (March 2003).
https://doi.org/10.1016/s0045-7949(03)00017-8
-
El-Ghandour, Hamdy A. / Elbeltagi, Emad (2018): Comparison of Five Evolutionary Algorithms for Optimization of Water Distribution Networks. In: Journal of Computing in Civil Engineering, v. 32, n. 1 (January 2018).
https://doi.org/10.1061/(asce)cp.1943-5487.0000717
-
Hegazy, Tarek / Elbeltagi, Emad (1999): EvoSite: Evolution-Based Model for Site Layout Planning. In: Journal of Computing in Civil Engineering, v. 13, n. 3 (July 1999).
https://doi.org/10.1061/(asce)0887-3801(1999)13:3(198)
-
Ammar, Mohammad A. / Elbeltagi, Emad (2001): Algorithm for Determining Controlling Path Considering Resource Continuity. In: Journal of Computing in Civil Engineering, v. 15, n. 4 (October 2001).
https://doi.org/10.1061/(asce)0887-3801(2001)15:4(292)
-
Hegazy, Tarek / Shabeeb, Abdul Karim / Elbeltagi, Emad / Cheema, Tariq (2000): Algorithm for Scheduling with Multiskilled Constrained Resources. In: Journal of Construction Engineering and Management, v. 126, n. 6 (December 2000).
https://doi.org/10.1061/(asce)0733-9364(2000)126:6(414)
-
Elbeltagi, Emad / Hegazy, Tarek / Eldosouky, Adel (2004): Dynamic Layout of Construction Temporary Facilities Considering Safety. In: Journal of Construction Engineering and Management, v. 130, n. 4 (August 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:4(534)
-
Hegazy, Tarek / Elhakeem, Ahmed / Elbeltagi, Emad (2004): Distributed Scheduling Model for Infrastructure Networks. In: Journal of Construction Engineering and Management, v. 130, n. 2 (April 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:2(160)
-
Elbeltagi, Emad / Hegazy, Tarek (2001): A Hybrid AL-Based System for Site Layout Planning in Construction. In: Computer-Aided Civil and Infrastructure Engineering, v. 16, n. 2 (March 2001).
https://doi.org/10.1111/0885-9507.00215
-
Elbehairy, Hatem / Elbeltagi, Emad / Hegazy, Tarek / Soudki, Khaled (2006): Comparison of Two Evolutionary Algorithms for Optimization of Bridge Deck Repairs. In: Computer-Aided Civil and Infrastructure Engineering, v. 21, n. 8 (November 2006).
https://doi.org/10.1111/j.1467-8667.2006.00458.x
-
Elbeltagi, Emad / Dawood, Mahmoud (2011): Integrated visualized time control system for repetitive construction projects. In: Automation in Construction, v. 20, n. 7 (November 2011).
https://doi.org/10.1016/j.autcon.2011.03.012
-
Hegazy, Tarek / Elbeltagi, Emad / Zhang, Kehui (2005): Keeping Better Site Records Using Intelligent Bar Charts. In: Journal of Construction Engineering and Management, v. 131, n. 5 (May 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:5(513)
-
Elbeltagi, Emad / Hegazy, Tarek / Grierson, Donald (2007): A modified shuffled frog-leaping optimization algorithm: applications to project management. In: Structure and Infrastructure Engineering, v. 3, n. 1 (March 2007).
https://doi.org/10.1080/15732470500254535
-
Kaloop, Mosbeh R. / Elbeltagi, Emad / Elnabwy, Mohamed T. (2015): Bridge Monitoring with Wavelet Principal Component and Spectrum Analysis Based on GPS Measurements: Case Study of the Mansoura Bridge in Egypt. In: Journal of Performance of Constructed Facilities (ASCE), v. 29, n. 3 (June 2015).
https://doi.org/10.1061/(asce)cf.1943-5509.0000559