0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Hegazy, Tarek / Elbeltagi, Emad / El-Behairy, Hatem (2004): Bridge Deck Management System with Integrated Life-Cycle Cost Optimization. Dans: Transportation Research Record: Journal of the Transportation Research Board, v. 1866, n. 1 (janvier 2004).

    https://doi.org/10.3141/1866-06

  2. El Hakea, Ayman H. / Sami, Mahmoud / Badawy, Abdelhay / Elbeltagi, Emad / Hosny, Ossama / Iskander, Moheb / Abu-Samra, Soliman (2024): Risk-Based Self-Improving Asset Management Framework for Coastal Protection Structures Using 1+ Inspection Points. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 38, n. 3 (juin 2024).

    https://doi.org/10.1061/jpcfev.cfeng-4633

  3. Kosbar, Mohamed M. / Elbeltagi, Emad / Mahdi, Ibrahim / Kassem, Mahmoud / Ehab, A. (2023): Off-Site Manufacturing: Determining Decision-Making Factors. Dans: Buildings, v. 13, n. 11 (26 octobre 2023).

    https://doi.org/10.3390/buildings13112856

  4. Salah, Mona / Khallaf, Rana / Elbeltagi, Emad / Wefki, Hossam (2023): Construction Site Layout Planning: A Social Network Analysis. Dans: Buildings, v. 13, n. 10 (10 octobre 2023).

    https://doi.org/10.3390/buildings13102637

  5. Amien, Doaa H. / Elbeltagi, Emad / Mashhour, Ibrahim M. / Ehab, Ahmed (2023): Impact of COVID-19 on Construction Production Rate. Dans: Buildings, v. 13, n. 5 (27 avril 2023).

    https://doi.org/10.3390/buildings13051127

  6. Elbeltagi, Emad / Wefki, Hossam / Khallaf, Rana (2023): Sustainable Building Optimization Model for Early-Stage Design. Dans: Buildings, v. 13, n. 1 (13 janvier 2023).

    https://doi.org/10.3390/buildings13010074

  7. Altassan, Abdulrahman / Othman, Mahmoud / Elbeltagi, Emad / Abdelshakor, Mohammed / Ehab, A. (2023): A Qualitative Investigation of the Obstacles Inherent in the Implementation of Building Information Modeling (BIM). Dans: Buildings, v. 13, n. 3 (26 février 2023).

    https://doi.org/10.3390/buildings13030700

  8. Eissa, Radwa / Eid, Mohamed S. / Elbeltagi, Emad (2021): Current Applications of Game Theory in Construction Engineering and Management Research: A Social Network Analysis Approach. Dans: Journal of Construction Engineering and Management, v. 147, n. 7 (juillet 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002085

  9. Eissa, Radwa / Eid, Mohamed S. / Elbeltagi, Emad (2021): Conceptual Profit Allocation Framework for Construction Joint Ventures: Shapley Value Approach. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 3 (mai 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000911

  10. Elbeltagi, Emad / Ammar, Mohammed / Sanad, Haytham / Kassab, Moustafa (2016): Overall multiobjective optimization of construction projects scheduling using particle swarm. Dans: Engineering, Construction and Architectural Management, v. 23, n. 3 (mai 2016).

    https://doi.org/10.1108/ecam-11-2014-0135

  11. Elkalla, Israa / Elbeltagi, Emad / El Shikh, Mohamed (2021): Solving Fuzzy Time–Cost Trade-Off in Construction Projects Using Linear Programming. Dans: Journal of The Institution of Engineers (India): Series A, v. 102, n. 1 (janvier 2021).

    https://doi.org/10.1007/s40030-020-00489-7

  12. Sahlol, Doaa Gamal / Elbeltagi, Emad / Elzoughiby, Mohamed / Elrahman, Mohammed Abd (2021): Sustainable building materials Assessment and selection using system dynamics. Dans: Journal of Building Engineering, v. 35 (mars 2021).

    https://doi.org/10.1016/j.jobe.2020.101978

  13. Kaloop, Mosbeh R. / Kim, Kyoung Ho / Elbeltagi, Emad / Jin, Xinghan / Hu, Jong Wan (2020): Service-Life Evaluation of Existing Bridges Subjected to Static and Moving Trucks Using Structural Health Monitoring System: Case Study. Dans: KSCE Journal of Civil Engineering, v. 24, n. 5 (avril 2020).

    https://doi.org/10.1007/s12205-020-2128-1

  14. Attalla, Mohamed / Hegazy, Tarek / Elbeltagi, Emad (2004): In-House Delivery of Multiple-Small Reconstruction Projects. Dans: Journal of Management in Engineering (ASCE), v. 20, n. 1 (janvier 2004).

    https://doi.org/10.1061/(asce)0742-597x(2004)20:1(25)

  15. Sakla, Sherief S. S. / Elbeltagi, Emad (2003): Design of steel roofs subjected to drifted snow using genetic optimization. Dans: Computers & Structures, v. 81, n. 6 (mars 2003).

    https://doi.org/10.1016/s0045-7949(03)00017-8

  16. El-Ghandour, Hamdy A. / Elbeltagi, Emad (2018): Comparison of Five Evolutionary Algorithms for Optimization of Water Distribution Networks. Dans: Journal of Computing in Civil Engineering, v. 32, n. 1 (janvier 2018).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000717

  17. Hegazy, Tarek / Elbeltagi, Emad (1999): EvoSite: Evolution-Based Model for Site Layout Planning. Dans: Journal of Computing in Civil Engineering, v. 13, n. 3 (juillet 1999).

    https://doi.org/10.1061/(asce)0887-3801(1999)13:3(198)

  18. Ammar, Mohammad A. / Elbeltagi, Emad (2001): Algorithm for Determining Controlling Path Considering Resource Continuity. Dans: Journal of Computing in Civil Engineering, v. 15, n. 4 (octobre 2001).

    https://doi.org/10.1061/(asce)0887-3801(2001)15:4(292)

  19. Hegazy, Tarek / Shabeeb, Abdul Karim / Elbeltagi, Emad / Cheema, Tariq (2000): Algorithm for Scheduling with Multiskilled Constrained Resources. Dans: Journal of Construction Engineering and Management, v. 126, n. 6 (décembre 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:6(414)

  20. Elbeltagi, Emad / Hegazy, Tarek / Eldosouky, Adel (2004): Dynamic Layout of Construction Temporary Facilities Considering Safety. Dans: Journal of Construction Engineering and Management, v. 130, n. 4 (août 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:4(534)

  21. Hegazy, Tarek / Elhakeem, Ahmed / Elbeltagi, Emad (2004): Distributed Scheduling Model for Infrastructure Networks. Dans: Journal of Construction Engineering and Management, v. 130, n. 2 (avril 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:2(160)

  22. Elbeltagi, Emad / Hegazy, Tarek (2001): A Hybrid AL-Based System for Site Layout Planning in Construction. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 16, n. 2 (mars 2001).

    https://doi.org/10.1111/0885-9507.00215

  23. Elbehairy, Hatem / Elbeltagi, Emad / Hegazy, Tarek / Soudki, Khaled (2006): Comparison of Two Evolutionary Algorithms for Optimization of Bridge Deck Repairs. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 21, n. 8 (novembre 2006).

    https://doi.org/10.1111/j.1467-8667.2006.00458.x

  24. Elbeltagi, Emad / Dawood, Mahmoud (2011): Integrated visualized time control system for repetitive construction projects. Dans: Automation in Construction, v. 20, n. 7 (novembre 2011).

    https://doi.org/10.1016/j.autcon.2011.03.012

  25. Hegazy, Tarek / Elbeltagi, Emad / Zhang, Kehui (2005): Keeping Better Site Records Using Intelligent Bar Charts. Dans: Journal of Construction Engineering and Management, v. 131, n. 5 (mai 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:5(513)

  26. Elbeltagi, Emad / Hegazy, Tarek / Grierson, Donald (2007): A modified shuffled frog-leaping optimization algorithm: applications to project management. Dans: Structure and Infrastructure Engineering, v. 3, n. 1 (mars 2007).

    https://doi.org/10.1080/15732470500254535

  27. Elbeltagi, Emad / Hosny, Ossama A. / Elhakeem, Ahmed / Abd-Elrazek, Mohamed Emam / Abdullah, Ahmed (2011): Selection of slab formwork system using fuzzy logic. Dans: Construction Management and Economics, v. 29, n. 7 (juillet 2011).

    https://doi.org/10.1080/01446193.2011.590144

  28. Elbeltagi, Emad / Hegazy, Tarek / Hosny, Abdel Hady / Eldosouky, Adel (2001): Schedule-dependent evolution of site layout planning. Dans: Construction Management and Economics, v. 19, n. 7 (novembre 2001).

    https://doi.org/10.1080/01446190110066713

  29. Kaloop, Mosbeh R. / Elbeltagi, Emad / Elnabwy, Mohamed T. (2015): Bridge Monitoring with Wavelet Principal Component and Spectrum Analysis Based on GPS Measurements: Case Study of the Mansoura Bridge in Egypt. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 29, n. 3 (juin 2015).

    https://doi.org/10.1061/(asce)cf.1943-5509.0000559

  30. Elbeltagi, Emad / Wefki, Hossam / Abdrabou, Saad / Dawood, Mahmoud / Ramzy, Ahmed (2017): Visualized strategy for predicting buildings energy consumption during early design stage using parametric analysis. Dans: Journal of Building Engineering, v. 13 (septembre 2017).

    https://doi.org/10.1016/j.jobe.2017.07.012

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine