0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Islam H. El-adaway ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Shiha, Ahmed / El-adaway, Islam H. (2024): Forecasting Construction Material Prices Using Macroeconomic Indicators of Trading Partners. In: Journal of Management in Engineering (ASCE), v. 40, n. 5 (September 2024).

    https://doi.org/10.1061/jmenea.meeng-6106

  2. Khalef, Ramy / El-adaway, Islam H. (2024): Investigating Causes of Disputes Resulting in Litigation in Airport Development Projects in the United States Using Graph-Based Techniques. In: Journal of Management in Engineering (ASCE), v. 40, n. 3 (May 2024).

    https://doi.org/10.1061/jmenea.meeng-5903

  3. Abdul Nabi, Mohamad / El-adaway, Islam H. / Assaad, Rayan H. (2024): Modeling Inflation Transmission among Different Construction Materials. In: Journal of Construction Engineering and Management, v. 150, n. 5 (May 2024).

    https://doi.org/10.1061/jcemd4.coeng-13893

  4. Abdul Nabi, Mohamad / Assaad, Rayan H. / El-adaway, Islam H. (2024): Modeling and Understanding Dispute Causation in the US Public–Private Partnership Projects. In: Journal of Infrastructure Systems, v. 30, n. 1 (March 2024).

    https://doi.org/10.1061/jitse4.iseng-2328

  5. Ahmed, Muaz O. / El-adaway, Islam H. (2022): An integrated game-theoretic and reinforcement learning modeling for multi-stage construction and infrastructure bidding. In: Construction Management and Economics, v. 41, n. 3 (November 2022).

    https://doi.org/10.1080/01446193.2022.2124528

  6. Khalef, Ramy / El-adaway, Islam H. (2023): Identifying Design-Build Decision-Making Factors and Providing Future Research Guidelines: Social Network and Association Rule Analysis. In: Journal of Construction Engineering and Management, v. 149, n. 1 (January 2023).

    https://doi.org/10.1061/(asce)co.1943-7862.0002431

  7. Assaad, Rayan H. / El-adaway, Islam H. / Hastak, Makarand / Needy, Kim LaScola (2023): Key Factors Affecting Labor Productivity in Offsite Construction Projects. In: Journal of Construction Engineering and Management, v. 149, n. 1 (January 2023).

    https://doi.org/10.1061/jcemd4.coeng-12654

  8. Ali, Gasser G. / El-adaway, Islam H. / Sims, Charles / Holladay, J. Scott / Chen, Chien-fei (2022): Policies and Incentives for Promoting Distributed Solar Generation: Impact on Electric Power Infrastructure. In: Journal of Infrastructure Systems, v. 28, n. 4 (December 2022).

    https://doi.org/10.1061/(asce)is.1943-555x.0000714

  9. Mutikanga, Harrison E. / Abdul Nabi, Mohamad / Ali, Gasser G. / El-adaway, Islam H. / Caldwell, Aubrie (2022): Postaward Construction and Contract Management of Engineering, Procurement, and Construction Hydropower Projects: Two Case Studies from Uganda. In: Journal of Management in Engineering (ASCE), v. 38, n. 6 (November 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001088

  10. Assaad, Rayan H. / El-adaway, Islam H. / Hastak, Makarand / Needy, Kim LaScola (2022): The Impact of Offsite Construction on the Workforce: Required Skillset and Prioritization of Training Needs. In: Journal of Construction Engineering and Management, v. 148, n. 7 (July 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002314

  11. Abdul Nabi, Mohamad / El-adaway, Islam H. (2022): A Proactive Risk Assessment Framework to Maximize Schedule Benefits of Modularization in Construction Projects. In: Journal of Construction Engineering and Management, v. 148, n. 7 (July 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002311

  12. Khalef, Ramy / Ali, Gasser G. / El-adaway, Islam H. / Gad, Ghada M. (2022): Managing construction projects impacted by the COVID-19 pandemic: a contractual perspective. In: Construction Management and Economics, v. 40, n. 4 (February 2022).

    https://doi.org/10.1080/01446193.2022.2031238

  13. Assaad, Rayan H. / Ahmed, Muaz O. / El-adaway, Islam H. / Shrestha, Pramen P. (2022): Management of Change Orders in Infrastructure Transportation Projects. In: Practice Periodical on Structural Design and Construction, v. 27, n. 1 (February 2022).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000640

  14. Ali, Gasser G. / Khalef, Ramy / El-adaway, Islam H. / Eid, Mohamed / Kahle, Troy / Funke, Cassandra / Vaupel, Martin / Nault, Austin (2021): Joint Venture Agreements for Construction and Professional Services: Comparative Contractual Analysis and Guidelines. In: Journal of Management in Engineering (ASCE), v. 37, n. 4 (July 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000940

  15. Fawzy, Salwa A. / El-adaway, Islam H. (2015): Global Total Cost Claims within Common Law Legal Systems: Application to the World Bank Contract. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 7, n. 2 (May 2015).

    https://doi.org/10.1061/(asce)la.1943-4170.0000155

  16. LaBarre, Philip S. / El-adaway, Islam H. (2014): Project Benchmarking: Tool for Mitigating Conflicts, Claims, and Disputes through Improved Performance. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 6, n. 1 (February 2014).

    https://doi.org/10.1061/(asce)la.1943-4170.0000140

  17. El-adaway, Islam H. (2010): Integrated Project Delivery Case Study: Guidelines for Drafting Partnering Contract. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 2, n. 4 (November 2010).

    https://doi.org/10.1061/(asce)la.1943-4170.0000024

  18. Elsayegh, Amr / El-adaway, Islam H. (2021): Holistic Study and Analysis of Factors Affecting Collaborative Planning in Construction. In: Journal of Construction Engineering and Management, v. 147, n. 4 (April 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002031

  19. Assaad, Rayan / El-adaway, Islam H. (2021): Guidelines for Responding to COVID-19 Pandemic: Best Practices, Impacts, and Future Research Directions. In: Journal of Management in Engineering (ASCE), v. 37, n. 3 (May 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000906

  20. El-adaway, Islam H. / Sims, Charles / Eid, Mohamed S. / Liu, Yinan / Ali, Gasser G. (2020): Preliminary Attempt toward Better Understanding the Impact of Distributed Energy Generation: An Agent-Based Computational Economics Approach. In: Journal of Infrastructure Systems, v. 26, n. 1 (March 2020).

    https://doi.org/10.1061/(asce)is.1943-555x.0000527

  21. Assaad, Rayan / El-adaway, Islam H. (2021): Impact of Dynamic Workforce and Workplace Variables on the Productivity of the Construction Industry: New Gross Construction Productivity Indicator. In: Journal of Management in Engineering (ASCE), v. 37, n. 1 (January 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000862

  22. Abdul Nabi, Mohamad / El-adaway, Islam H. (2020): Modular Construction: Determining Decision-Making Factors and Future Research Needs. In: Journal of Management in Engineering (ASCE), v. 36, n. 6 (November 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000859

  23. Assaad, Rayan / El-adaway, Islam H. / Abotaleb, Ibrahim S. (2020): Predicting Project Performance in the Construction Industry. In: Journal of Construction Engineering and Management, v. 146, n. 5 (May 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001797

  24. Abotaleb, Ibrahim S. / El-adaway, Islam H. / Moussa, Mohamed B. (2019): Guidelines for Administrating and Drafting Nonpayment Owners' Obligation Provisions under Design-Build Contracts. In: Journal of Management in Engineering (ASCE), v. 35, n. 4 (July 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000693

  25. Abotaleb, Ibrahim S. / El-adaway, Islam H. (2018): Managing Construction Projects through Dynamic Modeling: Reviewing the Existing Body of Knowledge and Deriving Future Research Directions. In: Journal of Management in Engineering (ASCE), v. 34, n. 6 (November 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000633

  26. Boz, Mehmet A. / El-adaway, Islam H. (2014): Managing Sustainability Assessment of Civil Infrastructure Projects Using Work, Nature, and Flow. In: Journal of Management in Engineering (ASCE), v. 30, n. 5 (September 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000203

  27. El-adaway, Islam H. / Truax, Dennis D. (2014): Managing the LEED Analysis for the New Civil and Environmental Engineering Complex at Mississippi State University. In: Journal of Management in Engineering (ASCE), v. 30, n. 3 (May 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000171

  28. El-adaway, Islam H. (2012): Insurance Pricing for Windstorm-Susceptible Developments: Bootstrapping Approach. In: Journal of Management in Engineering (ASCE), v. 28, n. 2 (April 2012).

    https://doi.org/10.1061/(asce)me.1943-5479.0000088

  29. Eid, Mohamed S. / El-adaway, Islam H. (2017): Integrating the Social Vulnerability of Host Communities and the Objective Functions of Associated Stakeholders during Disaster Recovery Processes Using Agent-Based Modeling. In: Journal of Computing in Civil Engineering, v. 31, n. 5 (September 2017).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000680

  30. El-adaway, Islam H. / Kandil, Amr A. (2010): Multiagent System for Construction Dispute Resolution (MAS-COR). In: Journal of Construction Engineering and Management, v. 136, n. 3 (March 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000144

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine