0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Integrated Project Delivery Case Study: Guidelines for Drafting Partnering Contract

Author(s): (Assistant Professor, Civil and Environmental Engineering/Building Construction Science, Mississippi State Univ., 899 Collegeview Street, 128 Giles Hall, P.O. Box 9633, Mississippi State, MS 39762.,)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 4, v. 2
Page(s): 248-254
DOI: 10.1061/(asce)la.1943-4170.0000024
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000024.
  • About this
    data sheet
  • Reference-ID
    10579666
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine