0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Nashwan Dawood

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. GhaffarianHoseini, Ali / GhaffarianHoseini, Amirhosein / Rahimian, Farzad / Dawood, Nashwan (2022): Guest editorial – Future construction: design solutions and approaches. In: Smart and Sustainable Built Environment, v. 11, n. 2 (July 2022).

    https://doi.org/10.1108/sasbe-07-2022-236

  2. Ahmad, Ahmad Mohammad / Rodriguez Trejo, Sergio / Hafeez, Mian Atif / Dawood, Nashwan / Kassem, Mohamad / Naji, Khalid Kamal (2022): Drivers for energy analysis towards a BIM-enabled information flow. In: Smart and Sustainable Built Environment, v. 12, n. 3 (April 2022).

    https://doi.org/10.1108/sasbe-07-2021-0129

  3. Adu-Amankwa, Nana Akua N. / Rahimian, Farzad Pour / Dawood, Nashwan / Park, Chansik (2023): Digital Twins and Blockchain technologies for building lifecycle management. In: Automation in Construction, v. 155 (November 2023).

    https://doi.org/10.1016/j.autcon.2023.105064

  4. Sivashanmugam, Subarna / Rodriguez, Sergio / Rahimian, Farzad Pour / Elghaish, Faris / Dawood, Nashwan (2023): Enhancing information standards for automated construction waste quantification and classification. In: Automation in Construction, v. 152 (August 2023).

    https://doi.org/10.1016/j.autcon.2023.104898

  5. Ahmed, Tariq G. / Gudlaugsson, Bjarnhedinn / Ogwumike, Chris / Dawood, Huda / Short, Michael / Dawood, Nashwan (2023): Evaluation framework for Techno-economic analysis of energy system retrofit technologies. In: Energy and Buildings, v. 286 (May 2023).

    https://doi.org/10.1016/j.enbuild.2023.112967

  6. Matarneh, Sandra / Elghaish, Faris / Rahimian, Farzad Pour / Dawood, Nashwan / Edwards, David (2022): Automated and interconnected facility management system: An open IFC cloud-based BIM solution. In: Automation in Construction, v. 143 (November 2022).

    https://doi.org/10.1016/j.autcon.2022.104569

  7. Potseluyko, Lilia / Rahimian, Farzad Pour / Dawood, Nashwan / Elghaish, Faris / Hajirasouli, Aso (2022): Game-like interactive environment using BIM-based virtual reality for the timber frame self-build housing sector. In: Automation in Construction, v. 142 (October 2022).

    https://doi.org/10.1016/j.autcon.2022.104496

  8. Pidgeon, Andrew / Dawood, Nashwan (2021): Bridging the gap between theory and practice for adopting meaningful collaborative BIM processes in infrastructure projects, utilising multi-criteria decision making (MCDM). In: Journal of Information Technology in Construction, v. 26 (January 2021).

    https://doi.org/10.36680/j.itcon.2021.043

  9. Dawood, Nashwan / Rahimian, Farzad Pour (2021): Construction 4.0: Established and emerging digital technologies within the construction industry. In: Journal of Information Technology in Construction, v. 26 (January 2021).

    https://doi.org/10.36680/j.itcon.2021.041

  10. Kassem, Mohamad / Dawood, Nashwan / Mitchell, Donald: A decision support system for the selection of curtain wall systems at the design development stage. In: Construction Management and Economics.

    https://doi.org/10.1080/01446193.2012.725940

  11. Chahrour, Racha / Hafeez, Mian Atif / Ahmad, Ahmad Mohammad / Sulieman, Hashim Ibnauf / Dawood, Huda / Rodriguez-Trejo, Sergio / Kassem, Mohamad / Naji, Khalid Kamal / Dawood, Nashwan (2020): Cost-benefit analysis of BIM-enabled design clash detection and resolution. In: Construction Management and Economics, v. 39, n. 1 (July 2020).

    https://doi.org/10.1080/01446193.2020.1802768

  12. Pidgeon, Andrew / Dawood, Nashwan (2021): BIM Adoption Issues in Infrastructure Construction Projects: Analysis and Solutions. In: Journal of Information Technology in Construction, v. 26 (January 2021).

    https://doi.org/10.36680/j.itcon.2021.015

  13. Dawood, Nashwan / Sikka, Sushant (2009): Development of 4D based performance indicators in construction industry. In: Engineering, Construction and Architectural Management, v. 16, n. 5 (September 2009).

    https://doi.org/10.1108/09699980910988357

  14. Dawood, Nashwan (2010): Development of 4D‐based performance indicators in construction industry. In: Engineering, Construction and Architectural Management, v. 17, n. 2 (March 2010).

    https://doi.org/10.1108/09699981011024704

  15. Albogamy, Abdullah / Dawood, Nashwan (2015): Development of a client-based risk management methodology for the early design stage of construction processes. Applied to the KSA. In: Engineering, Construction and Architectural Management, v. 22, n. 5 (September 2015).

    https://doi.org/10.1108/ecam-07-2014-0096

  16. Dawood, Saad / Crosbie, Tracey / Dawood, Nashwan / Lord, Richard (2013): Designing low carbon buildings: A framework to reduce energy consumption and embed the use of renewables. In: Sustainable Cities and Society, v. 8 (October 2013).

    https://doi.org/10.1016/j.scs.2013.01.005

  17. Rodriguez-Trejo, Sergio / Ahmad, Ahmad Mohammad / Hafeez, Mian Atif / Dawood, Huda / Vukovic, Vladimir / Kassem, Mohamad / Naji, Khalid K. / Dawood, Nashwan (2017): Hierarchy based information requirements for sustainable operations of buildings in Qatar. In: Sustainable Cities and Society, v. 32 (July 2017).

    https://doi.org/10.1016/j.scs.2017.03.005

  18. Patacas, João / Dawood, Nashwan / Kassem, Mohamad (2020): BIM for facilities management: A framework and a common data environment using open standards. In: Automation in Construction, v. 120 (December 2020).

    https://doi.org/10.1016/j.autcon.2020.103366

  19. Al-Bazi, Ammar / Dawood, Nashwan (2010): Developing Crew Allocation System for the Precast Industry Using Genetic Algorithms. Developing crew allocation system. In: Computer-Aided Civil and Infrastructure Engineering, v. 25, n. 8 (October 2010).

    https://doi.org/10.1111/j.1467-8667.2010.00666.x

  20. Kassem, Mohamad / Kelly, Graham / Dawood, Nashwan / Serginson, Michael / Lockley, Steve (2015): BIM in facilities management applications: a case study of a large university complex. In: Built Environment Project and Asset Management, v. 5, n. 3 (July 2015).

    https://doi.org/10.1108/bepam-02-2014-0011

  21. Dawood, Nashwan / Mallasi, Zaki (2006): Construction Workspace Planning: Assignment and Analysis Utilizing 4D Visualization Technologies. In: Computer-Aided Civil and Infrastructure Engineering, v. 21, n. 7 (October 2006).

    https://doi.org/10.1111/j.1467-8667.2006.00454.x

  22. Makanae, Koji / Dawood, Nashwan (2009): Development and Evaluation of a Tangible Terrain Representation System for Highway Route Planning. In: Computer-Aided Civil and Infrastructure Engineering, v. 24, n. 3 (April 2009).

    https://doi.org/10.1111/j.1467-8667.2008.00582.x

  23. Kang, Leen Seok / Moon, Hyoun Seok / Dawood, Nashwan / Kang, Min Su (2010): Development of methodology and virtual system for optimised simulation of road design data. In: Automation in Construction, v. 19, n. 8 (December 2010).

    https://doi.org/10.1016/j.autcon.2010.09.001

  24. Dawood, Nashwan / Sriprasert, Eknarin / Mallasi, Zaki / Hobbs, Brian (2003): Development of an integrated information resource base for 4D/VR construction processes simulation. In: Automation in Construction, v. 12, n. 2 (March 2003).

    https://doi.org/10.1016/s0926-5805(02)00045-6

  25. Crosbie, Tracey / Dawood, Nashwan / Dawood, Saad (2011): Improving the energy performance of the built environment: The potential of virtual collaborative life cycle tools. In: Automation in Construction, v. 20, n. 2 (March 2011).

    https://doi.org/10.1016/j.autcon.2010.09.018

  26. Shah, Raj Kapur / Dawood, Nashwan (2011): An innovative approach for generation of a time location plan in road construction projects. In: Construction Management and Economics, v. 29, n. 5 (May 2011).

    https://doi.org/10.1080/01446193.2011.563785

  27. Benjaoran, Vacharapoom / Dawood, Nashwan / Hobbs, Brian (2005): Flowshop scheduling model for bespoke precast concrete production planning. In: Construction Management and Economics, v. 23, n. 1 (January 2005).

    https://doi.org/10.1080/0144619042000287732

  28. Dawood, Nashwan / Sriprasert, Eknarin (2006): Construction scheduling using multi‐constraint and genetic algorithms approach. In: Construction Management and Economics, v. 24, n. 1 (January 2006).

    https://doi.org/10.1080/01446190500310486

  29. Dawood, Nashwan (1998): Estimating project and activity duration: a risk management approach using network analysis. In: Construction Management and Economics, v. 16, n. 1 (January 1998).

    https://doi.org/10.1080/014461998372574

  30. Kim, Hando / Benghi, Claudio / Dawood, Nashwan / Jung, Doyoung / Kim, Jaehong / Baek, Yeongin (2010): Developing 5D System Connecting Cost, Schedule and 3D Model. Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010.

    https://doi.org/10.2749/222137810796024998

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine