• DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Dawood, Nashwan / Sikka, Sushant (2009): Development of 4D based performance indicators in construction industry. Dans: Engineering, Construction and Architectural Management, v. 16, n. 5 (septembre 2009).

    https://doi.org/10.1108/09699980910988357

  2. Dawood, Nashwan (2010): Development of 4D‐based performance indicators in construction industry. Dans: Engineering, Construction and Architectural Management, v. 17, n. 2 (mars 2010).

    https://doi.org/10.1108/09699981011024704

  3. Albogamy, Abdullah / Dawood, Nashwan (2015): Development of a client-based risk management methodology for the early design stage of construction processes. Applied to the KSA. Dans: Engineering, Construction and Architectural Management, v. 22, n. 5 (septembre 2015).

    https://doi.org/10.1108/ecam-07-2014-0096

  4. Dawood, Saad / Crosbie, Tracey / Dawood, Nashwan / Lord, Richard (2013): Designing low carbon buildings: A framework to reduce energy consumption and embed the use of renewables. Dans: Sustainable Cities and Society, v. 8 (octobre 2013).

    https://doi.org/10.1016/j.scs.2013.01.005

  5. Rodriguez-Trejo, Sergio / Ahmad, Ahmad Mohammad / Hafeez, Mian Atif / Dawood, Huda / Vukovic, Vladimir / Kassem, Mohamad / Naji, Khalid K. / Dawood, Nashwan (2017): Hierarchy based information requirements for sustainable operations of buildings in Qatar. Dans: Sustainable Cities and Society, v. 32 (juillet 2017).

    https://doi.org/10.1016/j.scs.2017.03.005

  6. Dawood, Huda / Siddle, Jonathan / Dawood, Nashwan (2019): Integrating IFC and NLP for automating change request validations. Dans: Journal of Information Technology in Construction, v. 24 (février 2019).

    https://doi.org/10.36680/j.itcon.2019.030

  7. Patacas, João / Dawood, Nashwan / Kassem, Mohamad (2020): BIM for facilities management: A framework and a common data environment using open standards. Dans: Automation in Construction, v. 120 (décembre 2020).

    https://doi.org/10.1016/j.autcon.2020.103366

  8. Al-Bazi, Ammar / Dawood, Nashwan (2010): Developing Crew Allocation System for the Precast Industry Using Genetic Algorithms. Developing crew allocation system. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 25, n. 8 (octobre 2010).

    https://doi.org/10.1111/j.1467-8667.2010.00666.x

  9. Rahimian, Farzad Pour / Seyedzadeh, Saleh / Oliver, Stephen / Rodriguez, Sergio / Dawood, Nashwan (2020): On-demand monitoring of construction projects through a game-like hybrid application of BIM and machine learning. Dans: Automation in Construction, v. 110 (février 2020).

    https://doi.org/10.1016/j.autcon.2019.103012

  10. Dawood, Nashwan (2019): Short-Term Prediction of Energy Consumption in Demand Response for Blocks of Buildings: DR-BoB Approach. Dans: Buildings, v. 9, n. 10 (25 septembre 2019).

    https://doi.org/10.3390/buildings9100221

  11. Kassem, Mohamad / Kelly, Graham / Dawood, Nashwan / Serginson, Michael / Lockley, Steve (2015): BIM in facilities management applications: a case study of a large university complex. Dans: Built Environment Project and Asset Management, v. 5, n. 3 (juillet 2015).

    https://doi.org/10.1108/bepam-02-2014-0011

  12. Rasys, Edvinas / Hodds, Michael / Dawood, Nashwan / Kassem, Mohamad (2014): A Web3D Enabled Information Integration Framework for Facility Management. Dans: Australasian Journal of Construction Economics and Building - Conference Series, v. 2, n. 1 (janvier 2014).

    https://doi.org/10.5130/ajceb-cs.v2i1.3763

  13. Marasini, Ramesh / Dawood, Nashwan (2006): Innovative managerial control system (IMCS): an application in precast concrete building products industry. Dans: Construction Innovation, v. 6, n. 2 (juin 2006).

    https://doi.org/10.1108/14714170610710640

  14. Al-Bazi, Ammar / Dawood, Nashwan (2017): Simulation-based optimisation using simulated annealing for crew allocation in the precast industry. Dans: Architectural Engineering and Design Management, v. 14, n. 1-2 (décembre 2017).

    https://doi.org/10.1080/17452007.2017.1313721

  15. Dawood, Nashwan / Mallasi, Zaki (2006): Construction Workspace Planning: Assignment and Analysis Utilizing 4D Visualization Technologies. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 21, n. 7 (octobre 2006).

    https://doi.org/10.1111/j.1467-8667.2006.00454.x

  16. Makanae, Koji / Dawood, Nashwan (2009): Development and Evaluation of a Tangible Terrain Representation System for Highway Route Planning. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 24, n. 3 (avril 2009).

    https://doi.org/10.1111/j.1467-8667.2008.00582.x

  17. Kang, Leen Seok / Moon, Hyoun Seok / Dawood, Nashwan / Kang, Min Su (2010): Development of methodology and virtual system for optimised simulation of road design data. Dans: Automation in Construction, v. 19, n. 8 (décembre 2010).

    https://doi.org/10.1016/j.autcon.2010.09.001

  18. Dawood, Nashwan / Sriprasert, Eknarin / Mallasi, Zaki / Hobbs, Brian (2003): Development of an integrated information resource base for 4D/VR construction processes simulation. Dans: Automation in Construction, v. 12, n. 2 (mars 2003).

    https://doi.org/10.1016/s0926-5805(02)00045-6

  19. Dawood, Nashwan / Marasini, Ramesh (2003): Visualisation of a stockyard layout simulator “SimStock”: a case study in precast concrete products industry. Dans: Automation in Construction, v. 12, n. 2 (mars 2003).

    https://doi.org/10.1016/s0926-5805(02)00044-4

  20. Crosbie, Tracey / Dawood, Nashwan / Dawood, Saad (2011): Improving the energy performance of the built environment: The potential of virtual collaborative life cycle tools. Dans: Automation in Construction, v. 20, n. 2 (mars 2011).

    https://doi.org/10.1016/j.autcon.2010.09.018

  21. Benjaoran, Vacharapoom / Dawood, Nashwan (2006): Intelligence approach to production planning system for bespoke precast concrete products. Dans: Automation in Construction, v. 15, n. 6 (novembre 2006).

    https://doi.org/10.1016/j.autcon.2005.09.007

  22. Shah, Raj Kapur / Dawood, Nashwan (2011): An innovative approach for generation of a time location plan in road construction projects. Dans: Construction Management and Economics, v. 29, n. 5 (mai 2011).

    https://doi.org/10.1080/01446193.2011.563785

  23. Benjaoran, Vacharapoom / Dawood, Nashwan / Hobbs, Brian (2005): Flowshop scheduling model for bespoke precast concrete production planning. Dans: Construction Management and Economics, v. 23, n. 1 (janvier 2005).

    https://doi.org/10.1080/0144619042000287732

  24. Dawood, Nashwan / Sriprasert, Eknarin (2006): Construction scheduling using multi‐constraint and genetic algorithms approach. Dans: Construction Management and Economics, v. 24, n. 1 (janvier 2006).

    https://doi.org/10.1080/01446190500310486

  25. Dawood, Nashwan (1998): Estimating project and activity duration: a risk management approach using network analysis. Dans: Construction Management and Economics, v. 16, n. 1 (janvier 1998).

    https://doi.org/10.1080/014461998372574

  26. Kim, Hando / Benghi, Claudio / Dawood, Nashwan / Jung, Doyoung / Kim, Jaehong / Baek, Yeongin (2010): Developing 5D System Connecting Cost, Schedule and 3D Model. Présenté pendant: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010.

    https://doi.org/10.2749/222137810796024998

Rechercher une publication...

Disponible seulement avec
Mon Structurae