0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. GhaffarianHoseini, Ali / GhaffarianHoseini, Amirhosein / Rahimian, Farzad / Dawood, Nashwan (2022): Guest editorial – Future construction: design solutions and approaches. Dans: Smart and Sustainable Built Environment, v. 11, n. 2 (juillet 2022).

    https://doi.org/10.1108/sasbe-07-2022-236

  2. Ahmad, Ahmad Mohammad / Rodriguez Trejo, Sergio / Hafeez, Mian Atif / Dawood, Nashwan / Kassem, Mohamad / Naji, Khalid Kamal (2022): Drivers for energy analysis towards a BIM-enabled information flow. Dans: Smart and Sustainable Built Environment, v. 12, n. 3 (avril 2022).

    https://doi.org/10.1108/sasbe-07-2021-0129

  3. Adu-Amankwa, Nana Akua N. / Rahimian, Farzad Pour / Dawood, Nashwan / Park, Chansik (2023): Digital Twins and Blockchain technologies for building lifecycle management. Dans: Automation in Construction, v. 155 (novembre 2023).

    https://doi.org/10.1016/j.autcon.2023.105064

  4. Sivashanmugam, Subarna / Rodriguez, Sergio / Rahimian, Farzad Pour / Elghaish, Faris / Dawood, Nashwan (2023): Enhancing information standards for automated construction waste quantification and classification. Dans: Automation in Construction, v. 152 (août 2023).

    https://doi.org/10.1016/j.autcon.2023.104898

  5. Ahmed, Tariq G. / Gudlaugsson, Bjarnhedinn / Ogwumike, Chris / Dawood, Huda / Short, Michael / Dawood, Nashwan (2023): Evaluation framework for Techno-economic analysis of energy system retrofit technologies. Dans: Energy and Buildings, v. 286 (mai 2023).

    https://doi.org/10.1016/j.enbuild.2023.112967

  6. Matarneh, Sandra / Elghaish, Faris / Rahimian, Farzad Pour / Dawood, Nashwan / Edwards, David (2022): Automated and interconnected facility management system: An open IFC cloud-based BIM solution. Dans: Automation in Construction, v. 143 (novembre 2022).

    https://doi.org/10.1016/j.autcon.2022.104569

  7. Potseluyko, Lilia / Rahimian, Farzad Pour / Dawood, Nashwan / Elghaish, Faris / Hajirasouli, Aso (2022): Game-like interactive environment using BIM-based virtual reality for the timber frame self-build housing sector. Dans: Automation in Construction, v. 142 (octobre 2022).

    https://doi.org/10.1016/j.autcon.2022.104496

  8. Pidgeon, Andrew / Dawood, Nashwan (2021): Bridging the gap between theory and practice for adopting meaningful collaborative BIM processes in infrastructure projects, utilising multi-criteria decision making (MCDM). Dans: Journal of Information Technology in Construction, v. 26 (janvier 2021).

    https://doi.org/10.36680/j.itcon.2021.043

  9. Dawood, Nashwan / Rahimian, Farzad Pour (2021): Construction 4.0: Established and emerging digital technologies within the construction industry. Dans: Journal of Information Technology in Construction, v. 26 (janvier 2021).

    https://doi.org/10.36680/j.itcon.2021.041

  10. Kassem, Mohamad / Dawood, Nashwan / Mitchell, Donald: A decision support system for the selection of curtain wall systems at the design development stage. Dans: Construction Management and Economics.

    https://doi.org/10.1080/01446193.2012.725940

  11. Chahrour, Racha / Hafeez, Mian Atif / Ahmad, Ahmad Mohammad / Sulieman, Hashim Ibnauf / Dawood, Huda / Rodriguez-Trejo, Sergio / Kassem, Mohamad / Naji, Khalid Kamal / Dawood, Nashwan (2020): Cost-benefit analysis of BIM-enabled design clash detection and resolution. Dans: Construction Management and Economics, v. 39, n. 1 (juillet 2020).

    https://doi.org/10.1080/01446193.2020.1802768

  12. Pidgeon, Andrew / Dawood, Nashwan (2021): BIM Adoption Issues in Infrastructure Construction Projects: Analysis and Solutions. Dans: Journal of Information Technology in Construction, v. 26 (janvier 2021).

    https://doi.org/10.36680/j.itcon.2021.015

  13. Dawood, Nashwan / Sikka, Sushant (2009): Development of 4D based performance indicators in construction industry. Dans: Engineering, Construction and Architectural Management, v. 16, n. 5 (septembre 2009).

    https://doi.org/10.1108/09699980910988357

  14. Dawood, Nashwan (2010): Development of 4D‐based performance indicators in construction industry. Dans: Engineering, Construction and Architectural Management, v. 17, n. 2 (mars 2010).

    https://doi.org/10.1108/09699981011024704

  15. Albogamy, Abdullah / Dawood, Nashwan (2015): Development of a client-based risk management methodology for the early design stage of construction processes. Applied to the KSA. Dans: Engineering, Construction and Architectural Management, v. 22, n. 5 (septembre 2015).

    https://doi.org/10.1108/ecam-07-2014-0096

  16. Dawood, Saad / Crosbie, Tracey / Dawood, Nashwan / Lord, Richard (2013): Designing low carbon buildings: A framework to reduce energy consumption and embed the use of renewables. Dans: Sustainable Cities and Society, v. 8 (octobre 2013).

    https://doi.org/10.1016/j.scs.2013.01.005

  17. Rodriguez-Trejo, Sergio / Ahmad, Ahmad Mohammad / Hafeez, Mian Atif / Dawood, Huda / Vukovic, Vladimir / Kassem, Mohamad / Naji, Khalid K. / Dawood, Nashwan (2017): Hierarchy based information requirements for sustainable operations of buildings in Qatar. Dans: Sustainable Cities and Society, v. 32 (juillet 2017).

    https://doi.org/10.1016/j.scs.2017.03.005

  18. Patacas, João / Dawood, Nashwan / Kassem, Mohamad (2020): BIM for facilities management: A framework and a common data environment using open standards. Dans: Automation in Construction, v. 120 (décembre 2020).

    https://doi.org/10.1016/j.autcon.2020.103366

  19. Al-Bazi, Ammar / Dawood, Nashwan (2010): Developing Crew Allocation System for the Precast Industry Using Genetic Algorithms. Developing crew allocation system. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 25, n. 8 (octobre 2010).

    https://doi.org/10.1111/j.1467-8667.2010.00666.x

  20. Kassem, Mohamad / Kelly, Graham / Dawood, Nashwan / Serginson, Michael / Lockley, Steve (2015): BIM in facilities management applications: a case study of a large university complex. Dans: Built Environment Project and Asset Management, v. 5, n. 3 (juillet 2015).

    https://doi.org/10.1108/bepam-02-2014-0011

  21. Dawood, Nashwan / Mallasi, Zaki (2006): Construction Workspace Planning: Assignment and Analysis Utilizing 4D Visualization Technologies. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 21, n. 7 (octobre 2006).

    https://doi.org/10.1111/j.1467-8667.2006.00454.x

  22. Makanae, Koji / Dawood, Nashwan (2009): Development and Evaluation of a Tangible Terrain Representation System for Highway Route Planning. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 24, n. 3 (avril 2009).

    https://doi.org/10.1111/j.1467-8667.2008.00582.x

  23. Kang, Leen Seok / Moon, Hyoun Seok / Dawood, Nashwan / Kang, Min Su (2010): Development of methodology and virtual system for optimised simulation of road design data. Dans: Automation in Construction, v. 19, n. 8 (décembre 2010).

    https://doi.org/10.1016/j.autcon.2010.09.001

  24. Dawood, Nashwan / Sriprasert, Eknarin / Mallasi, Zaki / Hobbs, Brian (2003): Development of an integrated information resource base for 4D/VR construction processes simulation. Dans: Automation in Construction, v. 12, n. 2 (mars 2003).

    https://doi.org/10.1016/s0926-5805(02)00045-6

  25. Crosbie, Tracey / Dawood, Nashwan / Dawood, Saad (2011): Improving the energy performance of the built environment: The potential of virtual collaborative life cycle tools. Dans: Automation in Construction, v. 20, n. 2 (mars 2011).

    https://doi.org/10.1016/j.autcon.2010.09.018

  26. Shah, Raj Kapur / Dawood, Nashwan (2011): An innovative approach for generation of a time location plan in road construction projects. Dans: Construction Management and Economics, v. 29, n. 5 (mai 2011).

    https://doi.org/10.1080/01446193.2011.563785

  27. Benjaoran, Vacharapoom / Dawood, Nashwan / Hobbs, Brian (2005): Flowshop scheduling model for bespoke precast concrete production planning. Dans: Construction Management and Economics, v. 23, n. 1 (janvier 2005).

    https://doi.org/10.1080/0144619042000287732

  28. Dawood, Nashwan / Sriprasert, Eknarin (2006): Construction scheduling using multi‐constraint and genetic algorithms approach. Dans: Construction Management and Economics, v. 24, n. 1 (janvier 2006).

    https://doi.org/10.1080/01446190500310486

  29. Dawood, Nashwan (1998): Estimating project and activity duration: a risk management approach using network analysis. Dans: Construction Management and Economics, v. 16, n. 1 (janvier 1998).

    https://doi.org/10.1080/014461998372574

  30. Kim, Hando / Benghi, Claudio / Dawood, Nashwan / Jung, Doyoung / Kim, Jaehong / Baek, Yeongin (2010): Developing 5D System Connecting Cost, Schedule and 3D Model. Présenté pendant: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010.

    https://doi.org/10.2749/222137810796024998

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine