Yiran Dan
- Integrated scheduling optimization of production and transportation for precast component with delivery time window. In: Engineering, Construction and Architectural Management. :
- Optimized flowshop scheduling for precast production considering process connection and blocking. In: Automation in Construction, v. 125 (May 2021). (2021):