Yiran Dan
- Integrated scheduling optimization of production and transportation for precast component with delivery time window. In: Engineering, Construction and Architectural Management, v. 31, n. 8 (April 2023). (2023):
- Optimized flowshop scheduling for precast production considering process connection and blocking. In: Automation in Construction, v. 125 (Mai 2021). (2021):