0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Symeon Christodoulou

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Christodoulou, Symeon (2010): Bid markā€up selection using artificial neural networks and an entropy metric. In: Engineering, Construction and Architectural Management, v. 17, n. 4 (July 2010).

    https://doi.org/10.1108/09699981011056600

  2. Christodoulou, Symeon / Griffis, F. H. (Bud) / Barrett, Lisa / Okungbowa, Max (2004): Qualifications-Based Selection of Professional A/E Services. In: Journal of Management in Engineering (ASCE), v. 20, n. 2 (April 2004).

    https://doi.org/10.1061/(asce)0742-597x(2004)20:2(34)

  3. Christodoulou, Symeon (2004): Educating Civil Engineering Professionals of Tomorrow. In: Journal of Professional Issues in Engineering Education and Practice, v. 130, n. 2 (April 2004).

    https://doi.org/10.1061/(asce)1052-3928(2004)130:2(90)

  4. Christodoulou, Symeon (2010): Scheduling Resource-Constrained Projects with Ant Colony Optimization Artificial Agents. In: Journal of Computing in Civil Engineering, v. 24, n. 1 (January 2010).

    https://doi.org/10.1061/(asce)0887-3801(2010)24:1(45)

  5. Christodoulou, Symeon (2004): Optimum Bid Markup Calculation Using Neurofuzzy Systems and Multidimensional Risk Analysis Algorithm. In: Journal of Computing in Civil Engineering, v. 18, n. 4 (October 2004).

    https://doi.org/10.1061/(asce)0887-3801(2004)18:4(322)

  6. Griffis, F. H. (Bud) / Christodoulou, Symeon (2000): Construction Risk Analysis Tool for Determining Liquidated Damages Insurance Premiums: Case Study. In: Journal of Construction Engineering and Management, v. 126, n. 6 (December 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:6(407)

  7. Christodoulou, Symeon / Ellinas, Georgios / Aslani, Pooyan (2009): Entropy-based scheduling of resource-constrained construction projects. In: Automation in Construction, v. 18, n. 7 (November 2009).

    https://doi.org/10.1016/j.autcon.2009.04.007

  8. Christodoulou, Symeon (2009): Construction imitating ants: Resource-unconstrained scheduling with artificial ants. In: Automation in Construction, v. 18, n. 3 (May 2009).

    https://doi.org/10.1016/j.autcon.2008.09.005

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine