Symeon Christodoulou
- Bid markāup selection using artificial neural networks and an entropy metric. In: Engineering, Construction and Architectural Management, v. 17, n. 4 (July 2010). (2010):
- Qualifications-Based Selection of Professional A/E Services. In: Journal of Management in Engineering (ASCE), v. 20, n. 2 (April 2004). (2004):
- Educating Civil Engineering Professionals of Tomorrow. In: Journal of Professional Issues in Engineering Education and Practice, v. 130, n. 2 (April 2004). (2004):
- Scheduling Resource-Constrained Projects with Ant Colony Optimization Artificial Agents. In: Journal of Computing in Civil Engineering, v. 24, n. 1 (January 2010). (2010):
- Optimum Bid Markup Calculation Using Neurofuzzy Systems and Multidimensional Risk Analysis Algorithm. In: Journal of Computing in Civil Engineering, v. 18, n. 4 (October 2004). (2004):
- Construction Risk Analysis Tool for Determining Liquidated Damages Insurance Premiums: Case Study. In: Journal of Construction Engineering and Management, v. 126, n. 6 (December 2000). (2000):
- Entropy-based scheduling of resource-constrained construction projects. In: Automation in Construction, v. 18, n. 7 (November 2009). (2009):
- Construction imitating ants: Resource-unconstrained scheduling with artificial ants. In: Automation in Construction, v. 18, n. 3 (May 2009). (2009):