0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Symeon Christodoulou

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Christodoulou, Symeon (2010): Bid mark‐up selection using artificial neural networks and an entropy metric. Dans: Engineering, Construction and Architectural Management, v. 17, n. 4 (juillet 2010).

    https://doi.org/10.1108/09699981011056600

  2. Christodoulou, Symeon / Griffis, F. H. (Bud) / Barrett, Lisa / Okungbowa, Max (2004): Qualifications-Based Selection of Professional A/E Services. Dans: Journal of Management in Engineering (ASCE), v. 20, n. 2 (avril 2004).

    https://doi.org/10.1061/(asce)0742-597x(2004)20:2(34)

  3. Christodoulou, Symeon (2004): Educating Civil Engineering Professionals of Tomorrow. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 130, n. 2 (avril 2004).

    https://doi.org/10.1061/(asce)1052-3928(2004)130:2(90)

  4. Christodoulou, Symeon (2010): Scheduling Resource-Constrained Projects with Ant Colony Optimization Artificial Agents. Dans: Journal of Computing in Civil Engineering, v. 24, n. 1 (janvier 2010).

    https://doi.org/10.1061/(asce)0887-3801(2010)24:1(45)

  5. Christodoulou, Symeon (2004): Optimum Bid Markup Calculation Using Neurofuzzy Systems and Multidimensional Risk Analysis Algorithm. Dans: Journal of Computing in Civil Engineering, v. 18, n. 4 (octobre 2004).

    https://doi.org/10.1061/(asce)0887-3801(2004)18:4(322)

  6. Griffis, F. H. (Bud) / Christodoulou, Symeon (2000): Construction Risk Analysis Tool for Determining Liquidated Damages Insurance Premiums: Case Study. Dans: Journal of Construction Engineering and Management, v. 126, n. 6 (décembre 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:6(407)

  7. Christodoulou, Symeon / Ellinas, Georgios / Aslani, Pooyan (2009): Entropy-based scheduling of resource-constrained construction projects. Dans: Automation in Construction, v. 18, n. 7 (novembre 2009).

    https://doi.org/10.1016/j.autcon.2009.04.007

  8. Christodoulou, Symeon (2009): Construction imitating ants: Resource-unconstrained scheduling with artificial ants. Dans: Automation in Construction, v. 18, n. 3 (mai 2009).

    https://doi.org/10.1016/j.autcon.2008.09.005

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine