- An optimization model for just-in-time (JIT) delivery of precast components considering 3D loading constraints, real-time road conditions and assembly time. In: Engineering, Construction and Architectural Management. :
- Three-Dimensional Measurement of Fire-Damaged Concrete Crack Development Using X-Ray CT Images. In: Journal of Performance of Constructed Facilities (ASCE), v. 37, n. 6 (December 2023). (2023):
- Smart bridge maintenance using cluster merging algorithm based on self-organizing map optimization. In: Automation in Construction, v. 152 (August 2023). (2023):
- Preventing or encouraging illegal activities by construction firms: effects of top management team compensation and aspiration-performance discrepancies. In: Engineering, Construction and Architectural Management, v. 28, n. 6 ( 2021). (2021):
- Towards people-centric smart city development: Investigating the citizens’ preferences and perceptions about smart-city services in Taiwan. In: Sustainable Cities and Society, v. 67 (April 2021). (2021):
- The Willingness to Adopt the Internet of Things (IOT) Conception in Taiwan’s Construction Industry. In: Journal of Civil Engineering and Management, v. 26, n. 6 (8 June 2020). (2020):
- Preventive Interface Management for Design-Build Wireless Train Control Mass Rapid Transit Projects. In: Journal of Performance of Constructed Facilities (ASCE), v. 34, n. 1 (February 2020). (2020):
- Quantifying Impact Factors of Corporate Financing: Engineering Consulting Firms. In: Journal of Management in Engineering (ASCE), v. 24, n. 2 (April 2008). (2008):
- Requirements Definition and Management Practice to Improve Project Outcomes/ Reikalavimų apibrėžimas ir vadyba gerinant projekto rezultatus. In: Journal of Civil Engineering and Management, v. 18, n. 1 (February 2012). (2012):
- Legal risks incurred under the application of BIM in Taiwan. In: Proceedings of the Institution of Civil Engineers - Forensic Engineering, v. 168, n. 3 (August 2015). (2015):
- Managing Complex Engineering Interfaces of Urban Mass Rapid Transit Projects. In: Journal of Construction Engineering and Management, v. 143, n. 6 (June 2017). (2017):
- Process reengineering and improvement for building precast production. In: Automation in Construction, v. 68 (August 2016). (2016):
- Optimizing profit and logistics for precast concrete production. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 44, n. 6 (June 2017). (2017):
- A self organizing map optimization based image recognition and processing model for bridge crack inspection. In: Automation in Construction, v. 73 (January 2017). (2017):