Andrew Shing-Tao Chang
- Reasons for Cost and Schedule Increase for Engineering Design Projects. In: Journal of Management in Engineering (ASCE), v. 18, n. 1 (January 2002). (2002):
- Defining Cost/Schedule Performance Indices and Their Ranges for Design Projects. In: Journal of Management in Engineering (ASCE), v. 17, n. 2 (April 2001). (2001):
- On-Call Contracting Strategy and Management. In: Journal of Management in Engineering (ASCE), v. 14, n. 4 (July 1998). (1998):
- Work-Time Model for Engineers. In: Journal of Construction Engineering and Management, v. 127, n. 2 (April 2001). (2001):
- Engineering Information Classification System. In: Journal of Construction Engineering and Management, v. 129, n. 4 (August 2003). (2003):