Andrew Shing-Tao Chang
- Reasons for Cost and Schedule Increase for Engineering Design Projects. Dans: Journal of Management in Engineering (ASCE), v. 18, n. 1 (janvier 2002). (2002):
- Defining Cost/Schedule Performance Indices and Their Ranges for Design Projects. Dans: Journal of Management in Engineering (ASCE), v. 17, n. 2 (avril 2001). (2001):
- On-Call Contracting Strategy and Management. Dans: Journal of Management in Engineering (ASCE), v. 14, n. 4 (juillet 1998). (1998):
- Work-Time Model for Engineers. Dans: Journal of Construction Engineering and Management, v. 127, n. 2 (avril 2001). (2001):
- Engineering Information Classification System. Dans: Journal of Construction Engineering and Management, v. 129, n. 4 (août 2003). (2003):