Nuhu Braimah
- (2024): Critical Evaluation of the Contract Selection Process Used in the Construction Industry of Kuwait. In: Buildings, v. 14, n. 8 (23 July 2024).
- Introducing a novel concept of wick drainage in masonry structures. In: Journal of Building Engineering, v. 51 (July 2022). (2022):
- Understanding Construction Delay Analysis and the Role of Preconstruction Programming. In: Journal of Management in Engineering (ASCE), v. 30, n. 5 (September 2014). (2014):
- (2017): A Systematic Method to Analyze Force Majeure in Construction Claims. In: Buildings, v. 7, n. 4 (January 2017).
- Internal heat liberation and strength development of self-cured geopolymers in ambient curing conditions. In: Construction and Building Materials, v. 114 (July 2016). (2016):
- Consultants' Perceptions on Construction Delay Analysis Methodologies. In: Journal of Construction Engineering and Management, v. 135, n. 12 (December 2009). (2009):
- Delay Analysis within Construction Contracting Organizations. In: Journal of Construction Engineering and Management, v. 134, n. 9 (September 2008). (2008):