Nuhu Braimah
- (2024): Critical Evaluation of the Contract Selection Process Used in the Construction Industry of Kuwait. Dans: Buildings, v. 14, n. 8 (23 juillet 2024).
- Introducing a novel concept of wick drainage in masonry structures. Dans: Journal of Building Engineering, v. 51 (juillet 2022). (2022):
- Understanding Construction Delay Analysis and the Role of Preconstruction Programming. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 5 (septembre 2014). (2014):
- (2017): A Systematic Method to Analyze Force Majeure in Construction Claims. Dans: Buildings, v. 7, n. 4 (janvier 2017).
- Internal heat liberation and strength development of self-cured geopolymers in ambient curing conditions. Dans: Construction and Building Materials, v. 114 (juillet 2016). (2016):
- Consultants' Perceptions on Construction Delay Analysis Methodologies. Dans: Journal of Construction Engineering and Management, v. 135, n. 12 (décembre 2009). (2009):
- Delay Analysis within Construction Contracting Organizations. Dans: Journal of Construction Engineering and Management, v. 134, n. 9 (septembre 2008). (2008):