- (2024): Semiautomated Primary Layout Definition with a Point Cloud for Building-Envelope Renovation. In: Buildings, v. 14, n. 2 (1 February 2024).
- (2023): An Automated Prefabricated Facade Layout Definition for Residential Building Renovation. In: Buildings, v. 13, n. 12 (22 November 2023).
- (2023): Deviation-Correcting Interface for Building-Envelope Renovation. In: Buildings, v. 13, n. 9 (23 August 2023).
- Identifying enablers and relational ontology networks in design for digital fabrication. In: Automation in Construction, v. 144 (December 2022). (2022):
- A New Approach to Building Design Modularization. In: Procedia Engineering, v. 85 ( 2014). (2014):
- A Case Study on Regenerating Informal Settlements in Cairo using Affordable and Adaptable Building System. In: Procedia Engineering, v. 196 ( 2017). (2017):
- (2020): A Simple Framework for the Cost–Benefit Analysis of Single-Task Construction Robots Based on a Case Study of a Cable-Driven Facade Installation Robot. In: Buildings, v. 11, n. 1 (22 December 2020).
- Structuring the context for construction robot development through integrated scenario approach. In: Automation in Construction, v. 114 (June 2020). (2020):
- Influencing factors of the future utilisation of construction robots for buildings: A Hong Kong perspective. In: Journal of Building Engineering, v. 30 (July 2020). (2020):
- A technology management system for the development of single-task construction robots. In: Construction Innovation, v. 20, n. 1 (6 January 2020). (2020):
- Changing Building Sites: Industrialisation and Automation of the Building Process. In: Architectural Design, v. 84, n. 3 (April 2014). (2014):
- Application of Infra-Free Motherboard (IFM) in a Decentralized Community for a Customized Real-time Processing Multidirectional Energy Supply Network. In: Journal of Asian Architecture and Building Engineering, v. 8, n. 2 (November 2009). (2009):
- Evolution of large‐scale industrialisation and service innovation in Japanese prefabrication industry. In: Construction Innovation, v. 12, n. 2 (April 2012). (2012):
- A methodology for the optimal modularization of building design. In: Automation in Construction, v. 65 (May 2016). (2016):
- The future of construction automation: Technological disruption and the upcoming ubiquity of robotics. In: Automation in Construction, v. 59 (November 2015). (2015):
- Towards a vision controlled robotic home environment. In: Automation in Construction, v. 39 (April 2014). (2014):
- Assistive robotic micro-rooms for independent living. In: Automation in Construction, v. 51 (March 2015). (2015):
- Leichtbau und Systeme. In: Detail - Zeitschrift für Architektur + Baudetail, v. 46, n. 7-8 ( 2006). (2006):
- Die letzte Herausforderung: Mobiles Bauen im Weltraum. In: Detail - Zeitschrift für Architektur + Baudetail, v. 38, n. 8 ( 1998). (1998):
- Robotik im Bauwesen (1). In: Detail - Zeitschrift für Architektur + Baudetail, v. 38, n. 5 ( 1998). (1998):
- Robotik im Bauwesen (3) - Fassadenroboter. In: Detail - Zeitschrift für Architektur + Baudetail, v. 38, n. 7 ( 1998). (1998):
- Robotik im Bauwesen (2): Das Dach wird zuerst gebaut - Automatisierte und roboterisierte Bausysteme. In: Detail - Zeitschrift für Architektur + Baudetail, v. 38, n. 6 (September 1998). (1998):