0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Leonhard E. Bernold

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Zekavat, Payam R. / Moon, Sungkon / Bernold, Leonhard E. (2015): Holonic Construction Management: Unified Framework for ICT-Supported Process Control. In: Journal of Management in Engineering (ASCE), v. 31, n. 1 (January 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000316

  2. Carver, Catherine / Bernold, Leonhard E. / Lorenc, Steven J. (1998): Averting Excavation Disaster. In: Journal of Management in Engineering (ASCE), v. 14, n. 1 (January 1998).

    https://doi.org/10.1061/(asce)0742-597x(1998)14:1(29)

  3. Bernold, Leonhard E. (2008): Applying Total-Quality-Management Principles to Improving Engineering Education. In: Journal of Professional Issues in Engineering Education and Practice, v. 134, n. 1 (January 2008).

    https://doi.org/10.1061/(asce)1052-3928(2008)134:1(33)

  4. Boles, Walter W. / Bernold, Leonhard E. / Scott, Wesley D. (1995): Lunar Shelter Student Contest: Exciting Education for Civil Engineers. In: Journal of Professional Issues in Engineering Education and Practice, v. 121, n. 4 (October 1995).

    https://doi.org/10.1061/(asce)1052-3928(1995)121:4(225)

  5. Din, Zia Ud / Bernold, Leonhard E. (2017): Experimental study of signal behavior for wireless communication in construction. In: Construction Innovation, v. 17, n. 4 (October 2017).

    https://doi.org/10.1108/ci-11-2016-0061

  6. Bernold, Leonhard E. / Abraham, Dulcy M. / Livingston, Eric E. (1989): Emulation for Control System Analysis in Automated Construction. In: Journal of Computing in Civil Engineering, v. 3, n. 4 (October 1989).

    https://doi.org/10.1061/(asce)0887-3801(1989)3:4(320)

  7. Bernold, Leonhard E. (1990): Bar Code‐Driven Equipment and Materials Tracking for Construction. In: Journal of Computing in Civil Engineering, v. 4, n. 4 (October 1990).

    https://doi.org/10.1061/(asce)0887-3801(1990)4:4(381)

  8. Salim, Md. / Bernold, Leonhard E. (1995): Design-Integrated Process Planner for Rebar Placement. In: Journal of Computing in Civil Engineering, v. 9, n. 2 (April 1995).

    https://doi.org/10.1061/(asce)0887-3801(1995)9:2(157)

  9. Bernold, Leonhard E. / Altobelli, Frank R. / Taylor, Henry (1992): Computer‐Controlled Brick Masonry. In: Journal of Computing in Civil Engineering, v. 6, n. 2 (April 1992).

    https://doi.org/10.1061/(asce)0887-3801(1992)6:2(147)

  10. Dunston, Phillip S. / Bernold, Leonhard E. (2000): Adaptive Control for Safe and Quality Rebar Fabrication. In: Journal of Construction Engineering and Management, v. 126, n. 2 (March 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:2(122)

  11. Bernold, Leonhard E. / Guler, Nil (1993): Analysis of Back Injuries in Construction. In: Journal of Construction Engineering and Management, v. 119, n. 3 (September 1993).

    https://doi.org/10.1061/(asce)0733-9364(1993)119:3(607)

  12. Salim, Md. / Bernold, Leonhard E. (1994): Effects of Design‐Integrated Process Planning on Productivity in Rebar Placement. In: Journal of Construction Engineering and Management, v. 120, n. 4 (December 1994).

    https://doi.org/10.1061/(asce)0733-9364(1994)120:4(720)

  13. Bernold, Leonhard E. / Lee, Tai Sik (2010): Experimental Research in Construction. In: Journal of Construction Engineering and Management, v. 136, n. 1 (January 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000085

  14. Moon, Sungwoo / Bernold, Leonhard E. (1998): Graphic-Based Human-Machine Interface for Construction Manipulator Control. In: Journal of Construction Engineering and Management, v. 124, n. 4 (July 1998).

    https://doi.org/10.1061/(asce)0733-9364(1998)124:4(305)

  15. Moon, Sungkon / Zekavat, Payam R. / Bernold, Leonhard E. (2015): Dynamic Control of Construction Supply Chain to Improve Labor Performance. In: Journal of Construction Engineering and Management, v. 141, n. 6 (June 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000970

  16. Moon, Sungkon / Zekavat, Payam R. / Bernold, Leonhard E. (2017): Dynamic Quality Control of Process Resource to Improve Concrete Supply Chain. In: Journal of Construction Engineering and Management, v. 143, n. 5 (May 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001270

  17. Huang, Xiaodong / Bernd, Daniel / Bernold, Leonhard E. (1996): Innovative Technology Development for Safe Excavation. In: Journal of Construction Engineering and Management, v. 122, n. 1 (March 1996).

    https://doi.org/10.1061/(asce)0733-9364(1996)122:1(91)

  18. Bernold, Leonhard E. (2005): Automatic As-Built Generation with Utility Trenchers. In: Journal of Construction Engineering and Management, v. 131, n. 6 (June 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:6(740)

  19. Rihani, Rami A. / Bernold, Leonhard E. (1994): Computer Integration for Robotic Masonry. In: Computer-Aided Civil and Infrastructure Engineering, v. 9, n. 1 (January 1994).

    https://doi.org/10.1111/j.1467-8667.1994.tb00362.x

  20. Dunston, Phillip S. / Bernold, Leonhard E. (1994): Adaptive Control for Robotic Rebar Bending. In: Computer-Aided Civil and Infrastructure Engineering, v. 9, n. 1 (January 1994).

    https://doi.org/10.1111/j.1467-8667.1994.tb00361.x

  21. Lorenc, Steven J. / Bernold, Leonhard E. (1998): Excavator-mounted ordnance locating system using electromagnetic sensing technology. In: Automation in Construction, v. 7, n. 4 (May 1998).

    https://doi.org/10.1016/s0926-5805(97)00069-1

  22. Bernold, Leonhard E. / Lee, Tai Sik / Koo, Ja Kyung / Moon, Deuk Soo (2010): Automated eco-friendly road stripe removal system. In: Automation in Construction, v. 19, n. 6 (October 2010).

    https://doi.org/10.1016/j.autcon.2010.02.013

  23. Lester, Jim / Bernold, Leonhard E. (2007): Innovative process to characterize buried utilities using Ground Penetrating Radar. In: Automation in Construction, v. 16, n. 4 (July 2007).

    https://doi.org/10.1016/j.autcon.2006.09.004

  24. Bernold, Leonhard E. (2007): Control schemes for tele‐robotic pipe installation. In: Automation in Construction, v. 16, n. 4 (July 2007).

    https://doi.org/10.1016/j.autcon.2006.09.002

  25. Kim, Kyoon-Tai / Bernold, Leonhard E. (2008): A comparison of two innovative technologies for safe pipe installation — "Pipeman" and the Stewart–Gough platform-based pipe manipulator. In: Automation in Construction, v. 17, n. 3 (March 2008).

    https://doi.org/10.1016/j.autcon.2007.04.004

  26. Lorenc, Steven J. / Handlon, Brian E. / Bernold, Leonhard E. (2000): Development of a robotic bridge maintenance system. In: Automation in Construction, v. 9, n. 3 (May 2000).

    https://doi.org/10.1016/s0926-5805(99)00040-0

  27. Bernold, Leonhard E. (2003): Economic Model to Optimize Underground Utility Protection. In: Journal of Construction Engineering and Management, v. 129, n. 6 (December 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:6(645)

  28. Lee, Junbok / Lorenc, Steven J. / Bernold, Leonhard E. (2003): Comparative Performance Evaluation of Tele-Operated Pipe Laying. In: Journal of Construction Engineering and Management, v. 129, n. 1 (February 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:1(32)

  29. Kolera, Bopanna T. / Bernold, Leonhard E. (2006): Intelligent Utility Locating Tool for Excavators. In: Journal of Construction Engineering and Management, v. 132, n. 9 (September 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:9(919)

  30. Nuntasunti, Suchart / Bernold, Leonhard E. (2006): Experimental Assessment of Wireless Construction Technologies. In: Journal of Construction Engineering and Management, v. 132, n. 9 (September 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:9(1009)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine