-
Zekavat, Payam R. / Moon, Sungkon / Bernold, Leonhard E. (2015): Holonic Construction Management: Unified Framework for ICT-Supported Process Control. In: Journal of Management in Engineering (ASCE), v. 31, n. 1 (Januar 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000316
-
Carver, Catherine / Bernold, Leonhard E. / Lorenc, Steven J. (1998): Averting Excavation Disaster. In: Journal of Management in Engineering (ASCE), v. 14, n. 1 (Januar 1998).
https://doi.org/10.1061/(asce)0742-597x(1998)14:1(29)
-
Bernold, Leonhard E. (2008): Applying Total-Quality-Management Principles to Improving Engineering Education. In: Journal of Professional Issues in Engineering Education and Practice, v. 134, n. 1 (Januar 2008).
https://doi.org/10.1061/(asce)1052-3928(2008)134:1(33)
-
Boles, Walter W. / Bernold, Leonhard E. / Scott, Wesley D. (1995): Lunar Shelter Student Contest: Exciting Education for Civil Engineers. In: Journal of Professional Issues in Engineering Education and Practice, v. 121, n. 4 (Oktober 1995).
https://doi.org/10.1061/(asce)1052-3928(1995)121:4(225)
-
Din, Zia Ud / Bernold, Leonhard E. (2017): Experimental study of signal behavior for wireless communication in construction. In: Construction Innovation, v. 17, n. 4 (Oktober 2017).
https://doi.org/10.1108/ci-11-2016-0061
-
Bernold, Leonhard E. / Abraham, Dulcy M. / Livingston, Eric E. (1989): Emulation for Control System Analysis in Automated Construction. In: Journal of Computing in Civil Engineering, v. 3, n. 4 (Oktober 1989).
https://doi.org/10.1061/(asce)0887-3801(1989)3:4(320)
-
Bernold, Leonhard E. (1990): Bar Code‐Driven Equipment and Materials Tracking for Construction. In: Journal of Computing in Civil Engineering, v. 4, n. 4 (Oktober 1990).
https://doi.org/10.1061/(asce)0887-3801(1990)4:4(381)
-
Salim, Md. / Bernold, Leonhard E. (1995): Design-Integrated Process Planner for Rebar Placement. In: Journal of Computing in Civil Engineering, v. 9, n. 2 (April 1995).
https://doi.org/10.1061/(asce)0887-3801(1995)9:2(157)
-
Bernold, Leonhard E. / Altobelli, Frank R. / Taylor, Henry (1992): Computer‐Controlled Brick Masonry. In: Journal of Computing in Civil Engineering, v. 6, n. 2 (April 1992).
https://doi.org/10.1061/(asce)0887-3801(1992)6:2(147)
-
Dunston, Phillip S. / Bernold, Leonhard E. (2000): Adaptive Control for Safe and Quality Rebar Fabrication. In: Journal of Construction Engineering and Management, v. 126, n. 2 (März 2000).
https://doi.org/10.1061/(asce)0733-9364(2000)126:2(122)
-
Bernold, Leonhard E. / Guler, Nil (1993): Analysis of Back Injuries in Construction. In: Journal of Construction Engineering and Management, v. 119, n. 3 (September 1993).
https://doi.org/10.1061/(asce)0733-9364(1993)119:3(607)
-
Salim, Md. / Bernold, Leonhard E. (1994): Effects of Design‐Integrated Process Planning on Productivity in Rebar Placement. In: Journal of Construction Engineering and Management, v. 120, n. 4 (Dezember 1994).
https://doi.org/10.1061/(asce)0733-9364(1994)120:4(720)
-
Bernold, Leonhard E. / Lee, Tai Sik (2010): Experimental Research in Construction. In: Journal of Construction Engineering and Management, v. 136, n. 1 (Januar 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000085
-
Moon, Sungwoo / Bernold, Leonhard E. (1998): Graphic-Based Human-Machine Interface for Construction Manipulator Control. In: Journal of Construction Engineering and Management, v. 124, n. 4 (Juli 1998).
https://doi.org/10.1061/(asce)0733-9364(1998)124:4(305)
-
Moon, Sungkon / Zekavat, Payam R. / Bernold, Leonhard E. (2015): Dynamic Control of Construction Supply Chain to Improve Labor Performance. In: Journal of Construction Engineering and Management, v. 141, n. 6 (Juni 2015).
https://doi.org/10.1061/(asce)co.1943-7862.0000970
-
Moon, Sungkon / Zekavat, Payam R. / Bernold, Leonhard E. (2017): Dynamic Quality Control of Process Resource to Improve Concrete Supply Chain. In: Journal of Construction Engineering and Management, v. 143, n. 5 (Mai 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001270
-
Huang, Xiaodong / Bernd, Daniel / Bernold, Leonhard E. (1996): Innovative Technology Development for Safe Excavation. In: Journal of Construction Engineering and Management, v. 122, n. 1 (März 1996).
https://doi.org/10.1061/(asce)0733-9364(1996)122:1(91)
-
Bernold, Leonhard E. (2005): Automatic As-Built Generation with Utility Trenchers. In: Journal of Construction Engineering and Management, v. 131, n. 6 (Juni 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:6(740)
-
Rihani, Rami A. / Bernold, Leonhard E. (1994): Computer Integration for Robotic Masonry. In: Computer-Aided Civil and Infrastructure Engineering, v. 9, n. 1 (Januar 1994).
https://doi.org/10.1111/j.1467-8667.1994.tb00362.x
-
Dunston, Phillip S. / Bernold, Leonhard E. (1994): Adaptive Control for Robotic Rebar Bending. In: Computer-Aided Civil and Infrastructure Engineering, v. 9, n. 1 (Januar 1994).
https://doi.org/10.1111/j.1467-8667.1994.tb00361.x
-
Lorenc, Steven J. / Bernold, Leonhard E. (1998): Excavator-mounted ordnance locating system using electromagnetic sensing technology. In: Automation in Construction, v. 7, n. 4 (Mai 1998).
https://doi.org/10.1016/s0926-5805(97)00069-1
-
Bernold, Leonhard E. / Lee, Tai Sik / Koo, Ja Kyung / Moon, Deuk Soo (2010): Automated eco-friendly road stripe removal system. In: Automation in Construction, v. 19, n. 6 (Oktober 2010).
https://doi.org/10.1016/j.autcon.2010.02.013
-
Lester, Jim / Bernold, Leonhard E. (2007): Innovative process to characterize buried utilities using Ground Penetrating Radar. In: Automation in Construction, v. 16, n. 4 (Juli 2007).
https://doi.org/10.1016/j.autcon.2006.09.004
-
Bernold, Leonhard E. (2007): Control schemes for tele‐robotic pipe installation. In: Automation in Construction, v. 16, n. 4 (Juli 2007).
https://doi.org/10.1016/j.autcon.2006.09.002
-
Kim, Kyoon-Tai / Bernold, Leonhard E. (2008): A comparison of two innovative technologies for safe pipe installation — "Pipeman" and the Stewart–Gough platform-based pipe manipulator. In: Automation in Construction, v. 17, n. 3 (März 2008).
https://doi.org/10.1016/j.autcon.2007.04.004
-
Lorenc, Steven J. / Handlon, Brian E. / Bernold, Leonhard E. (2000): Development of a robotic bridge maintenance system. In: Automation in Construction, v. 9, n. 3 (Mai 2000).
https://doi.org/10.1016/s0926-5805(99)00040-0
-
Bernold, Leonhard E. (2003): Economic Model to Optimize Underground Utility Protection. In: Journal of Construction Engineering and Management, v. 129, n. 6 (Dezember 2003).
https://doi.org/10.1061/(asce)0733-9364(2003)129:6(645)
-
Lee, Junbok / Lorenc, Steven J. / Bernold, Leonhard E. (2003): Comparative Performance Evaluation of Tele-Operated Pipe Laying. In: Journal of Construction Engineering and Management, v. 129, n. 1 (Februar 2003).
https://doi.org/10.1061/(asce)0733-9364(2003)129:1(32)
-
Kolera, Bopanna T. / Bernold, Leonhard E. (2006): Intelligent Utility Locating Tool for Excavators. In: Journal of Construction Engineering and Management, v. 132, n. 9 (September 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:9(919)
-
Nuntasunti, Suchart / Bernold, Leonhard E. (2006): Experimental Assessment of Wireless Construction Technologies. In: Journal of Construction Engineering and Management, v. 132, n. 9 (September 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:9(1009)