Samuel Ariaratnam
- Risk-based Life-cycle Costing of Infrastructure Rehabilitation and Construction Alternatives. In: Journal of Infrastructure Systems, v. 9, n. 1 (March 2003). (2003):
- Selecting project delivery methods for water treatment plants. In: Engineering, Construction and Architectural Management, v. 27, n. 4 ( 2020). (2020):