0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Khalid S. Al-Gahtani ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Alriabi, Mohammad Yaman. / Almohsen, Abdulmohsen S. / Alsanabani, Naif M. / Al-Gahtani, Khalid S.: Developing a cost-predictive model for hospital construction projects. In: Journal of Asian Architecture and Building Engineering.

    https://doi.org/10.1080/13467581.2024.2397119

  2. Al-Gahtani, Khalid S. / Alsugair, Abdullah M. / Alsanabani, Naif M. / Alabduljabbar, Abdulmajeed A. / Almohsen, Abdulmohsen S.: ANN prediction model of final construction cost at an early stage. In: Journal of Asian Architecture and Building Engineering.

    https://doi.org/10.1080/13467581.2023.2294883

  3. Al-Gahtani, Khalid S. / Aldokhi, Mohammed I. / Alsanabani, Naif M. / Alotaibi, Hatim F. / Bin Mahmoud, Abdulrahman A. (2024): The Impact of Dynamic Risk Interdependencies on the Saudi Precast Concrete Industry. In: Buildings, v. 14, n. 4 (27 March 2024).

    https://doi.org/10.3390/buildings14040875

  4. Almohsen, Abdulmohsen S. / Alsanabani, Naif M. / Alsugair, Abdullah M. / Al-Gahtani, Khalid S. (2023): Integrated artificial and deep neural networks with time series to predict the ratio of the low bid to owner estimate. In: Engineering, Construction and Architectural Management, v. 31, n. 13 (November 2023).

    https://doi.org/10.1108/ecam-05-2023-0454

  5. Alnaser, Aljawharah A. / Alsanabani, Naif M. / Al-Gahtani, Khalid S. (2023): BIM Impact on Construction Project Time Using System Dynamics in Saudi Arabia’s Construction. In: Buildings, v. 13, n. 9 (23 August 2023).

    https://doi.org/10.3390/buildings13092267

  6. Alsugair, Abdulah M. / Alsanabani, Naif M. / Al-Gahtani, Khalid S. (2023): Forecasting the Final Contract Cost on the Basis of the Owner’s Cost Estimation Using an Artificial Neural Network. In: Buildings, v. 13, n. 3 (26 February 2023).

    https://doi.org/10.3390/buildings13030786

  7. Saud, Ammar M. / Al-Gahtani, Khalid S. / Alsugair, Abdullah M. (2022): Exterior walls selection framework using Building Information Modeling (BIM). In: Cogent Engineering, v. 9, n. 1 (2 May 2022).

    https://doi.org/10.1080/23311916.2022.2088642

  8. Al Rahhal Al Orabi, Mohamed A. / Al-Gahtani, Khalid S. (2022): A Framework of Selecting Building Flooring Finishing Materials by Using Building Information Modeling (BIM). In: Advances in Civil Engineering, v. 2022 (January 2022).

    https://doi.org/10.1155/2022/8556714

  9. Al-Gahtani, Khalid S. (2009): Float Allocation Using the Total Risk Approach. In: Journal of Construction Engineering and Management, v. 135, n. 2 (February 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:2(88)

  10. Al-Gahtani, Khalid S. / Al-Sulaihi, Ibrahim A. / Iqupal, Asif (2016): Total float management: computerized technique for construction delay analysis. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 43, n. 5 (May 2016).

    https://doi.org/10.1139/cjce-2015-0434

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine