- (2025): Cost–Benefit Framework for Selecting a Highway Project Using the SWARA Approach. Dans: Buildings, v. 15, n. 3 (21 janvier 2025).
- Developing a cost-predictive model for hospital construction projects. Dans: Journal of Asian Architecture and Building Engineering. :
- ANN prediction model of final construction cost at an early stage. Dans: Journal of Asian Architecture and Building Engineering. :
- (2024): The Impact of Dynamic Risk Interdependencies on the Saudi Precast Concrete Industry. Dans: Buildings, v. 14, n. 4 (27 mars 2024).
- Integrated artificial and deep neural networks with time series to predict the ratio of the low bid to owner estimate. Dans: Engineering, Construction and Architectural Management, v. 31, n. 13 (novembre 2023). (2023):
- (2023): BIM Impact on Construction Project Time Using System Dynamics in Saudi Arabia’s Construction. Dans: Buildings, v. 13, n. 9 (23 août 2023).
- (2023): Forecasting the Final Contract Cost on the Basis of the Owner’s Cost Estimation Using an Artificial Neural Network. Dans: Buildings, v. 13, n. 3 (26 février 2023).
- Exterior walls selection framework using Building Information Modeling (BIM). Dans: Cogent Engineering, v. 9, n. 1 (2 mai 2022). (2022):
- (2022): A Framework of Selecting Building Flooring Finishing Materials by Using Building Information Modeling (BIM). Dans: Advances in Civil Engineering, v. 2022 (janvier 2022).
- Float Allocation Using the Total Risk Approach. Dans: Journal of Construction Engineering and Management, v. 135, n. 2 (février 2009). (2009):
- Total float management: computerized technique for construction delay analysis. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 43, n. 5 (mai 2016). (2016):