0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Simaan M. AbouRizk ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Ebrahimy, Yasser / AbouRizk, Simaan M. / Fernando, Siri / Mohamed, Yasser (2011): Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain. In: Engineering, Construction and Architectural Management, v. 18, n. 5 (September 2011).

    https://doi.org/10.1108/09699981011074600

  2. Ji, Wenying / Li, Yitong / AbouRizk, Simaan M. (2019): Integrated data-driven approach for analyzing pipe welding operator-quality performance. In: Automation in Construction, v. 106 (October 2019).

    https://doi.org/10.1016/j.autcon.2019.04.009

  3. Ji, Wenying / AbouRizk, Simaan M. (2018): Simulation-Based Analytics for Quality Control Decision Support: Pipe Welding Case Study. In: Journal of Computing in Civil Engineering, v. 32, n. 3 (May 2018).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000755

  4. Zhang, Limao / Wu, Xianguo / Zhu, Hongping / AbouRizk, Simaan M. (2017): Performing Global Uncertainty and Sensitivity Analysis from Given Data in Tunnel Construction. In: Journal of Computing in Civil Engineering, v. 31, n. 6 (November 2017).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000714

  5. Zhang, Limao / Wu, Xianguo / Ji, Wenying / AbouRizk, Simaan M. (2017): Intelligent Approach to Estimation of Tunnel-Induced Ground Settlement Using Wavelet Packet and Support Vector Machines. In: Journal of Computing in Civil Engineering, v. 31, n. 2 (March 2017).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000621

  6. Song, Lingguang / AbouRizk, Simaan M. (2006): Virtual Shop Model for Experimental Planning of Steel Fabrication Projects. In: Journal of Computing in Civil Engineering, v. 20, n. 5 (September 2006).

    https://doi.org/10.1061/(asce)0887-3801(2006)20:5(308)

  7. Hajjar, Dany / AbouRizk, Simaan M. (2000): Integrating Document Management with Project and Company Data. In: Journal of Computing in Civil Engineering, v. 14, n. 1 (January 2000).

    https://doi.org/10.1061/(asce)0887-3801(2000)14:1(70)

  8. AbouRizk, Simaan M. / Halpin, Daniel W. (1990): Probabilistic Simulation Studies for Repetitive Construction Processes. In: Journal of Construction Engineering and Management, v. 116, n. 4 (December 1990).

    https://doi.org/10.1061/(asce)0733-9364(1990)116:4(575)

  9. AbouRizk, Simaan M. / Halpin, Daniel W. (1992): Statistical Properties of Construction Duration Data. In: Journal of Construction Engineering and Management, v. 118, n. 3 (September 1992).

    https://doi.org/10.1061/(asce)0733-9364(1992)118:3(525)

  10. Hijazi, Adib M. / AbouRizk, Simaan M. / Halpin, Daniel W. (1992): Modeling and Simulating Learning Development in Construction. In: Journal of Construction Engineering and Management, v. 118, n. 4 (December 1992).

    https://doi.org/10.1061/(asce)0733-9364(1992)118:4(685)

  11. AbouRizk, Simaan M. / Halpin, Daniel W. / Wilson, James R. (1991): Visual Interactive Fitting of Beta Distributions. In: Journal of Construction Engineering and Management, v. 117, n. 4 (December 1991).

    https://doi.org/10.1061/(asce)0733-9364(1991)117:4(589)

  12. Hajjar, Dany / AbouRizk, Simaan M. (1998): Modeling and Analysis of Aggregate Production Operations. In: Journal of Construction Engineering and Management, v. 124, n. 5 (September 1998).

    https://doi.org/10.1061/(asce)0733-9364(1998)124:5(390)

  13. Hajjar, Dany / AbouRizk, Simaan M. (2002): Unified Modeling Methodology for Construction Simulation. In: Journal of Construction Engineering and Management, v. 128, n. 2 (April 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:2(174)

  14. AbouRizk, Simaan M. / Halpin, Daniel W. / Hill, Stephen L. (1991): Measuring Productivity and Validating Microcomputer Simulation. In: Computer-Aided Civil and Infrastructure Engineering, v. 6, n. 3 (May 1991).

    https://doi.org/10.1111/j.1467-8667.1991.tb00404.x

  15. Zhang, Limao / Liu, Mengjie / Wu, Xianguo / AbouRizk, Simaan M. (2016): Simulation-based route planning for pedestrian evacuation in metro stations: A case study. In: Automation in Construction, v. 71 (November 2016).

    https://doi.org/10.1016/j.autcon.2016.08.031

  16. Shi, Jingsheng / AbouRizk, Simaan M. (1997): Resource-Based Modeling for Construction Simulation. In: Journal of Construction Engineering and Management, v. 123, n. 1 (March 1997).

    https://doi.org/10.1061/(asce)0733-9364(1997)123:1(26)

  17. Song, Lingguang / AbouRizk, Simaan M. (2005): Quantifying Engineering Project Scope for Productivity Modeling. In: Journal of Construction Engineering and Management, v. 131, n. 3 (March 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:3(360)

  18. Sharma, Vishal / Al-Hussein, Mohamed / AbouRizk, Simaan M. (2006): Residential Construction Lot Grading Approval Process Optimization: Case Study of City of Edmonton. In: Journal of Construction Engineering and Management, v. 132, n. 12 (December 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:12(1225)

  19. Song, Lingguang / AbouRizk, Simaan M. (2008): Measuring and Modeling Labor Productivity Using Historical Data. In: Journal of Construction Engineering and Management, v. 134, n. 10 (October 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:10(786)

  20. McCabe, Brenda / AbouRizk, Simaan M. (2001): Performance measurement indices for simulated construction operations. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 3 (June 2001).

    https://doi.org/10.1139/l01-004

  21. AbouRizk, Simaan M. / Sawhney, Anil (1993): Subjective and interactive duration estimation. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 20, n. 3 (June 1993).

    https://doi.org/10.1139/l93-060

  22. Ruwanpura, Janaka Y. / AbouRizk, Simaan M. / Er, K. C. / Fernando, Siri (2001): Special purpose simulation templates for tunnel construction operations. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 2 (April 2001).

    https://doi.org/10.1139/cjce-28-2-222

  23. Ruwanpura, Janaka Y. / AbouRizk, Simaan M. / Er, K. C. / Fernando, Siri (2001): Special purpose simulation templates for tunnel construction operations. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 2 (April 2001).

    https://doi.org/10.1139/l00-101

  24. Song, Lingguang / Al-Battaineh, Hussien T. / AbouRizk, Simaan M. (2005): Modeling uncertainty with an integrated simulation system. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 32, n. 3 (June 2005).

    https://doi.org/10.1139/l05-004

  25. Shaheen, Ahmed A. / Fayek, Aminah Robinson / AbouRizk, Simaan M. (2009): Methodology for integrating fuzzy expert systems and discrete event simulation in construction engineering. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 9 (September 2009).

    https://doi.org/10.1139/l09-091

  26. Wang, Ping / AbouRizk, Simaan M. (2009): Large-scale simulation modeling system for industrial construction. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 9 (September 2009).

    https://doi.org/10.1139/l09-094

  27. Alvanchi, Amin / Azimi, Reza / Lee, SangHyun / AbouRizk, Simaan M. / Zubick, Paul (2012): Off-Site Construction Planning Using Discrete Event Simulation. In: Journal of Architectural Engineering (ASCE), v. 18, n. 2 (June 2012).

    https://doi.org/10.1061/(asce)ae.1943-5568.0000055

  28. Chehayeb, Nader N. / AbouRizk, Simaan M. (1998): Simulation-Based Scheduling with Continuous Activity Relationships. In: Journal of Construction Engineering and Management, v. 124, n. 2 (March 1998).

    https://doi.org/10.1061/(asce)0733-9364(1998)124:2(107)

  29. AbouRizk, Simaan M. / Fayek, Aminah Robinson / Al-Hussein, Mohamed (2017): The University of Alberta's Hole School of Construction Engineering: 25 Years of Impact and Innovation. In: Journal of Construction Engineering and Management, v. 143, n. 9 (September 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001364

  30. Zhang, Limao / Wu, Xianguo / Zhu, Hongping / AbouRizk, Simaan M. (2017): Perceiving safety risk of buildings adjacent to tunneling excavation: An information fusion approach. In: Automation in Construction, v. 73 (January 2017).

    https://doi.org/10.1016/j.autcon.2016.09.003

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine