0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Simaan M. AbouRizk ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Mohamed, Emad / Gerami Seresht, Nima / Hague, Stephen / Chehouri, Adam / AbouRizk, Simaan M. (2022): Domain-specific risk assessment using integrated simulation: A case study of an onshore wind project. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 49, n. 5 (May 2022).

    https://doi.org/10.1139/cjce-2021-0099

  2. Liu, Chang / Lei, Zhen / Morley, David / AbouRizk, Simaan M. (2020): Dynamic, Data-Driven Decision-Support Approach for Construction Equipment Acquisition and Disposal. In: Journal of Computing in Civil Engineering, v. 34, n. 2 (March 2020).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000871

  3. Wu, Lingzi / Ji, Wenying / AbouRizk, Simaan M. (2020): Bayesian Inference with Markov Chain Monte Carlo–Based Numerical Approach for Input Model Updating. In: Journal of Computing in Civil Engineering, v. 34, n. 1 (January 2020).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000862

  4. Song, Lingguang / Mohamed, Yasser / AbouRizk, Simaan M. (2009): Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance. In: Journal of Management in Engineering (ASCE), v. 25, n. 1 (January 2009).

    https://doi.org/10.1061/(asce)0742-597x(2009)25:1(12)

  5. AbouRizk, Simaan M. / Mandalapu, Srinivasa R. / Skibniewski, Miroslaw (1994): Analysis and Evaluation of Alternative Technologies. In: Journal of Management in Engineering (ASCE), v. 10, n. 3 (May 1994).

    https://doi.org/10.1061/(asce)9742-597x(1994)10:3(65)

  6. Liu, Chang / Ji, Wenying / AbouRizk, Simaan M. / Siu, Ming-Fung Francis (2019): Equipment Logistics Performance Measurement Using Data-Driven Social Network Analysis. In: Journal of Construction Engineering and Management, v. 145, n. 5 (May 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001659

  7. Sawhney, Anil / AbouRizk, Simaan M. (1996): Computerized Tool for Hierarchical Simulation Modeling. In: Journal of Computing in Civil Engineering, v. 10, n. 2 (April 1996).

    https://doi.org/10.1061/(asce)0887-3801(1996)10:2(115)

  8. Azimi, Reza / Lee, SangHyun / AbouRizk, Simaan M. (2012): Applying Basic Control Theory Principles to Project Control: Case Study of Off-Site Construction Shops. In: Journal of Computing in Civil Engineering, v. 26, n. 6 (November 2012).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000190

  9. Zhang, Yang / AbouRizk, Simaan M. / Xie, Hua / Moghani, Elmira (2012): Design and Implementation of Loose-Coupling Visualization Components in a Distributed Construction Simulation Environment with HLA. In: Journal of Computing in Civil Engineering, v. 26, n. 2 (March 2012).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000131

  10. Hajjar, Dany / AbouRizk, Simaan M. (2000): Application Framework for Development of Simulation Tools. In: Journal of Computing in Civil Engineering, v. 14, n. 3 (July 2000).

    https://doi.org/10.1061/(asce)0887-3801(2000)14:3(160)

  11. McCabe, Brenda / AbouRizk, Simaan M. / Goebel, Randy (1998): Belief Networks for Construction Performance Diagnostics. In: Journal of Computing in Civil Engineering, v. 12, n. 2 (April 1998).

    https://doi.org/10.1061/(asce)0887-3801(1998)12:2(93)

  12. AbouRizk, Simaan M. / Dozzi, S. Peter (1993): Application of Computer Simulation in Resolving Construction Disputes. In: Journal of Construction Engineering and Management, v. 119, n. 2 (June 1993).

    https://doi.org/10.1061/(asce)0733-9364(1993)119:2(355)

  13. Gonzalez‐Quevedo, Antonio A. / AbouRizk, Simaan M. / Iseley, David T. / Halpin, Daniel W. (1993): Comparison of Two Simulation Methodologies in Construction. In: Journal of Construction Engineering and Management, v. 119, n. 3 (September 1993).

    https://doi.org/10.1061/(asce)0733-9364(1993)119:3(573)

  14. AbouRizk, Simaan M. / Halpin, Daniel W. / Wilson, James R. (1994): Fitting Beta Distributions Based on Sample Data. In: Journal of Construction Engineering and Management, v. 120, n. 2 (June 1994).

    https://doi.org/10.1061/(asce)0733-9364(1994)120:2(288)

  15. Sawhney, Anil / AbouRizk, Simaan M. (1995): HSM-Simulation–Based Planning Method for Construction Projects. In: Journal of Construction Engineering and Management, v. 121, n. 3 (September 1995).

    https://doi.org/10.1061/(asce)0733-9364(1995)121:3(297)

  16. AbouRizk, Simaan M. / Gonzalez-Quevedo, Antonio A. / Halpin, Daniel W. (1990): Applications of Variance Reduction Techniques in Construction Simulation. In: Computer-Aided Civil and Infrastructure Engineering, v. 5, n. 4 (December 1990).

    https://doi.org/10.1111/j.1467-8667.1990.tb00390.x

  17. AbouRizk, Simaan M. / Chehayeb, Nader N. (1995): A Hypertext Decision Support Model for Contractor Prequalification. In: Computer-Aided Civil and Infrastructure Engineering, v. 10, n. 2 (March 1995).

    https://doi.org/10.1111/j.1467-8667.1995.tb00274.x

  18. Zhang, Xueqing / Mao, Xiaoming / AbouRizk, Simaan M. (2009): Developing a knowledge management system for improved value engineering practices in the construction industry. In: Automation in Construction, v. 18, n. 6 (October 2009).

    https://doi.org/10.1016/j.autcon.2009.03.004

  19. Ji, Wenying / AbouRizk, Simaan M. (2017): Credible interval estimation for fraction nonconforming: Analytical and numerical solutions. In: Automation in Construction, v. 83 (November 2017).

    https://doi.org/10.1016/j.autcon.2017.07.003

  20. Azimi, Reza / Lee, SangHyun / AbouRizk, Simaan M. / Alvanchi, Amin (2011): A framework for an automated and integrated project monitoring and control system for steel fabrication projects. In: Automation in Construction, v. 20, n. 1 (January 2011).

    https://doi.org/10.1016/j.autcon.2010.07.001

  21. Ruwanpura, Janaka Y. / AbouRizk, Simaan M. / Allouche, Michael (2005): An analytical method to predict soil types for underground construction operations. In: Civil Engineering and Environmental Systems, v. 22, n. 1 (March 2005).

    https://doi.org/10.1080/10286600500106696

  22. AbouRizk, Simaan M. / Wales, Rod J. (1997): Combined Discrete-Event/Continuous Simulation for Project Planning. In: Journal of Construction Engineering and Management, v. 123, n. 1 (March 1997).

    https://doi.org/10.1061/(asce)0733-9364(1997)123:1(11)

  23. Wang, Ping / Mohamed, Yasser / AbouRizk, Simaan M. / Rawa, A. R. Tony (2009): Flow Production of Pipe Spool Fabrication: Simulation to Support Implementation of Lean Technique. In: Journal of Construction Engineering and Management, v. 135, n. 10 (October 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000068

  24. Mao, Xiaoming / Zhang, Xueqing / AbouRizk, Simaan M. (2009): Enhancing Value Engineering Process by Incorporating Inventive Problem-Solving Techniques. In: Journal of Construction Engineering and Management, v. 135, n. 5 (May 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000001

  25. Sawhney, Anil / AbouRizk, Simaan M. / Halpin, Daniel W. (1998): Construction project simulation using CYCLONE. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 25, n. 1 (February 1998).

    https://doi.org/10.1139/l97-047

  26. AbouRizk, Simaan M. / Hajjar, Dany (1998): A framework for applying simulation in construction. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 25, n. 3 (June 1998).

    https://doi.org/10.1139/l97-123

  27. Alvanchi, Amin / Lee, SangHyun / AbouRizk, Simaan M. (2012): Dynamics of workforce skill evolution in construction projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 9 (September 2012).

    https://doi.org/10.1139/l2012-087

  28. Zhang, Xueqing / AbouRizk, Simaan M. (2006): Determining a reasonable concession period for private sector provision of public works and service. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 5 (May 2006).

    https://doi.org/10.1139/l06-010

  29. Ji, Wenying / AbouRizk, Simaan M. (2018): Data-Driven Simulation Model for Quality-Induced Rework Cost Estimation and Control Using Absorbing Markov Chains. In: Journal of Construction Engineering and Management, v. 144, n. 8 (August 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001534

  30. Ji, Wenying / AbouRizk, Simaan M. / Zaïane, Osmar R. / Li, Yitong (2018): Complexity Analysis Approach for Prefabricated Construction Products Using Uncertain Data Clustering. In: Journal of Construction Engineering and Management, v. 144, n. 8 (August 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001520

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine