0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

S. M. AbouRizk

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Lu, Ming / AbouRizk, S. M. / Hermann, Ulrich H. (2000): Estimating Labor Productivity Using Probability Inference Neural Network. In: Journal of Computing in Civil Engineering, v. 14, n. 4 (October 2000).

    https://doi.org/10.1061/(asce)0887-3801(2000)14:4(241)

  2. Lu, Ming / AbouRizk, S. M. / Hermann, U. H. (2001): Sensitivity Analysis of Neural Networks in Spool Fabrication Productivity Studies. In: Journal of Computing in Civil Engineering, v. 15, n. 4 (October 2001).

    https://doi.org/10.1061/(asce)0887-3801(2001)15:4(299)

  3. Mohamed, Y. / AbouRizk, S. M. (2005): Framework for Building Intelligent Simulation Models of Construction Operations. In: Journal of Computing in Civil Engineering, v. 19, n. 3 (July 2005).

    https://doi.org/10.1061/(asce)0887-3801(2005)19:3(277)

  4. Lu, Ming / AbouRizk, S. M. (2000): Simplified CPM/PERT Simulation Model. In: Journal of Construction Engineering and Management, v. 126, n. 3 (May 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:3(219)

  5. Dozzi, S. P. / AbouRizk, S. M. / Schroeder, S. L. (1996): Utility-Theory Model for Bid Markup Decisions. In: Journal of Construction Engineering and Management, v. 122, n. 2 (June 1996).

    https://doi.org/10.1061/(asce)0733-9364(1996)122:2(119)

  6. Shahin, A. / AbouRizk, S. M. / Mohamed, Y. (2011): Modeling Weather-Sensitive Construction Activity Using Simulation. In: Journal of Construction Engineering and Management, v. 137, n. 3 (March 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000258

  7. Lu, Yongcheng / AbouRizk, S. M. (2009): Automated Box–Jenkins forecasting modelling. In: Automation in Construction, v. 18, n. 5 (August 2009).

    https://doi.org/10.1016/j.autcon.2008.11.007

  8. Shaheen, Ahmed A. / Fayek, Aminah Robinson / AbouRizk, S. M. (2007): Fuzzy Numbers in Cost Range Estimating. In: Journal of Construction Engineering and Management, v. 133, n. 4 (April 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:4(325)

  9. Ruwanpura, J. Y. / AbouRizk, S. M. / Allouche, M. (2004): Analytical methods to reduce uncertainty in tunnel construction projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 31, n. 2 (February 2004).

    https://doi.org/10.1139/l03-105

  10. Shahin, A. / AbouRizk, S. M. / Mohamed, Y. / Fernando, S. (2014): Simulation modeling of weather-sensitive tunnelling construction activities subject to cold weather. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 1 (January 2014).

    https://doi.org/10.1139/cjce-2013-0087

  11. AbouRizk, S. M. / Babey, G. M. / Karumanasseri, G. (2002): Estimating the cost of capital projects: an empirical study of accuracy levels for municipal government projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 29, n. 5 (October 2002).

    https://doi.org/10.1139/l02-046

  12. Xu, Jianfei / AbouRizk, S. M. / Fraser, Cam (2003): Integrated three-dimensional computer-aided design and discrete-event simulation models. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 30, n. 2 (April 2003).

    https://doi.org/10.1139/l02-110

  13. Mohamed, Y. / AbouRizk, S. M. (2006): A hybrid approach for developing special purpose simulation tools. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 12 (December 2006).

    https://doi.org/10.1139/l06-073

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine