S. M. AbouRizk
- Estimating Labor Productivity Using Probability Inference Neural Network. Dans: Journal of Computing in Civil Engineering, v. 14, n. 4 (octobre 2000). (2000):
- Sensitivity Analysis of Neural Networks in Spool Fabrication Productivity Studies. Dans: Journal of Computing in Civil Engineering, v. 15, n. 4 (octobre 2001). (2001):
- Framework for Building Intelligent Simulation Models of Construction Operations. Dans: Journal of Computing in Civil Engineering, v. 19, n. 3 (juillet 2005). (2005):
- Simplified CPM/PERT Simulation Model. Dans: Journal of Construction Engineering and Management, v. 126, n. 3 (mai 2000). (2000):
- Utility-Theory Model for Bid Markup Decisions. Dans: Journal of Construction Engineering and Management, v. 122, n. 2 (juin 1996). (1996):
- Modeling Weather-Sensitive Construction Activity Using Simulation. Dans: Journal of Construction Engineering and Management, v. 137, n. 3 (mars 2011). (2011):
- Automated Box–Jenkins forecasting modelling. Dans: Automation in Construction, v. 18, n. 5 (août 2009). (2009):
- Fuzzy Numbers in Cost Range Estimating. Dans: Journal of Construction Engineering and Management, v. 133, n. 4 (avril 2007). (2007):
- Analytical methods to reduce uncertainty in tunnel construction projects. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 31, n. 2 (février 2004). (2004):
- Simulation modeling of weather-sensitive tunnelling construction activities subject to cold weather. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 1 (janvier 2014). (2014):
- Estimating the cost of capital projects: an empirical study of accuracy levels for municipal government projects. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 29, n. 5 (octobre 2002). (2002):
- Integrated three-dimensional computer-aided design and discrete-event simulation models. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 30, n. 2 (avril 2003). (2003):
- A hybrid approach for developing special purpose simulation tools. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 12 (décembre 2006). (2006):