0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

S. Alireza Abbasian-Hosseini

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Javanmardi, Ashtad / He, Chuanni / Hsiang, Simon M. / Abbasian-Hosseini, S. Alireza / Liu, Min (2023): Enhancing Construction Project Workflow Reliability through Observe–Plan–Do–Check–React Cycle: A Bridge Project Case Study. In: Buildings, v. 13, n. 9 (23 August 2023).

    https://doi.org/10.3390/buildings13092379

  2. Javanmardi, Ashtad / Abbasian-Hosseini, S. Alireza / Liu, Min / Hsiang, Simon M. (2020): Improving Effectiveness of Constraints Removal in Construction Planning Meetings: Information-Theoretic Approach. In: Journal of Construction Engineering and Management, v. 146, n. 4 (April 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001790

  3. Abbasian-Hosseini, S. Alireza / Liu, Min / Howell, Gregery (2018): Investigating the Cost-Benefit Trade-Off of Additional Planning Using Parade Game Simulation. In: Journal of Management in Engineering (ASCE), v. 34, n. 2 (March 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000580

  4. Javanmardi, Ashtad / Abbasian-Hosseini, S. Alireza / Liu, Min / Hsiang, Simon M. (2018): Benefit of Cooperation among Subcontractors in Performing High-Reliable Planning. In: Journal of Management in Engineering (ASCE), v. 34, n. 2 (March 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000578

  5. Abbasian-Hosseini, S. Alireza / Leming, Michael L. / Liu, Min (2016): Effects of Idle Time Restrictions on Excess Pollution from Construction Equipment. In: Journal of Management in Engineering (ASCE), v. 32, n. 2 (March 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000408

  6. Abbasian-Hosseini, S. Alireza / Liu, Min / Leming, Michael (2015): Comparison of Least-Cost and Least-Pollution Equipment Fleet Configurations Using Computer Simulation. In: Journal of Management in Engineering (ASCE), v. 31, n. 6 (November 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000360

  7. Abbasian-Hosseini, S. Alireza / Nikakhtar, Amin / Ghoddousi, Parviz (2014): Verification of lean construction benefits through simulation modeling: A case study of bricklaying process. In: KSCE Journal of Civil Engineering, v. 18, n. 5 (May 2014).

    https://doi.org/10.1007/s12205-014-0305-9

  8. Abbasian-Hosseini, S. Alireza / Liu, Min / Hsiang, Simon M. (2017): Social network conformity and construction work plan reliability. In: Automation in Construction, v. 78 (June 2017).

    https://doi.org/10.1016/j.autcon.2017.01.004

  9. Abbasian-Hosseini, S. Alireza / Hsiang, Simon M. / Leming, Michael L. / Liu, Min (2014): From Social Network to Data Envelopment Analysis: Identifying Benchmarks at the Site Management Level. In: Journal of Construction Engineering and Management, v. 140, n. 8 (August 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000875

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine