S. Alireza Abbasian-Hosseini
- (2023): Enhancing Construction Project Workflow Reliability through Observe–Plan–Do–Check–React Cycle: A Bridge Project Case Study. Dans: Buildings, v. 13, n. 9 (23 août 2023).
- Improving Effectiveness of Constraints Removal in Construction Planning Meetings: Information-Theoretic Approach. Dans: Journal of Construction Engineering and Management, v. 146, n. 4 (avril 2020). (2020):
- Investigating the Cost-Benefit Trade-Off of Additional Planning Using Parade Game Simulation. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 2 (mars 2018). (2018):
- Benefit of Cooperation among Subcontractors in Performing High-Reliable Planning. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 2 (mars 2018). (2018):
- Effects of Idle Time Restrictions on Excess Pollution from Construction Equipment. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 2 (mars 2016). (2016):
- Comparison of Least-Cost and Least-Pollution Equipment Fleet Configurations Using Computer Simulation. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 6 (novembre 2015). (2015):
- Verification of lean construction benefits through simulation modeling: A case study of bricklaying process. Dans: KSCE Journal of Civil Engineering, v. 18, n. 5 (mai 2014). (2014):
- Social network conformity and construction work plan reliability. Dans: Automation in Construction, v. 78 (juin 2017). (2017):
- From Social Network to Data Envelopment Analysis: Identifying Benchmarks at the Site Management Level. Dans: Journal of Construction Engineering and Management, v. 140, n. 8 (août 2014). (2014):