0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Status: under construction

Project Type

Structure: Girder bridge
Function / usage: Motorway bridge / freeway bridge
Material: Prestressed concrete bridge
Construction method: Incremental launching

Location

Location: , ,
, ,

Technical Information

Dimensions

total length 920 m
span lengths 3 x 40 m - 16 x 50 m
number of spans 19
horizontal radius of curvature 2 505 m
number of lanes 2 x 2

Materials

deck prestressed concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Tomaselli, Francesco (2004): Incremental benefits. In: Bridge Design & Engineering, v. 10, n. 36 (3rd Quarter 2004), pp. 62.
  • About this
    data sheet
  • Structure-ID
    20014850
  • Published on:
    27/12/2004
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine