• de
  • en
  • fr
  • International Database and Gallery of Structures

Westtangente Bridge at Kelheim

General Information

Completion: 1988
Status: in use

Project Type

Structure: Rigid frame bridge
Function / usage: Road bridge
Construction method: Span-by-span in-situ casting on falsework
Material: Prestressed concrete bridge

Location

Location: , , ,
Crosses:
  • Main-Danube Canal
Part of:

Technical Information

Dimensions

main span ca. 70 m
total length 120 m
deck deck width 13.5 m

Materials

substructure reinforced concrete
deck prestressed concrete

Participants

Owner
Architecture
Structural engineering

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000310
  • Date created
    10/06/1999
  • Last Update
    21/09/2017