Advertisement

Share

Follow

Tiergartenbrücke

General Information

Beginning of works: 1 March 2000
Completion: 31 October 2000
Status: in use

Project Type

Function / usage: Pedestrian bridge (footbridge)
Material: Steel bridge

Location

Location: , ,
Crosses:
  • Mulde River
Coordinates: 51° 49' 53.58" N    12° 14' 59.76" E
Show coordinates on a map

Technical Information

Dimensions

total length 107.65 m
arch angle of inclination 17°
exterior diameter 812.8 mm
deck horizontal radius of curvature 105 m

Materials

arch steel

Chronology

1 March 2000
- 31 October 2000

Construction period.

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004921
  • Date created
    09/09/2002
  • Last Update
    24/04/2016