Advertisement

Share

Follow

Donate

Talavera de la Reina Cable-stayed Bridge

General Information

Beginning of works: 2008
Completion: 2010
Status: in use

Project Type

Location

Location: , , ,
Coordinates: 39° 57' 4.00" N    4° 48' 21.00" W
Show coordinates on a map

Technical Information

Dimensions

main span 318 m
width 36.00 m
total length 729 m
deck deck width 36.00 m
girder depth 2.75 m
roadway / carriageway width 2 x 11.00 m
walkway width 2 x 3.50 m
pylon height 180 m
angle of inclination 68°
stay cables number of cables 152

Quantities

structural steel 753 t
concrete volume 72 108 m³
reinforcing steel 7 800 t
stay cables prestressing steel 1 785 t

Cost

cost of construction Euro 33 585 972.06

Materials

pylon high-strength reinforced concrete
steel
deck high-strength prestressed concrete
piers reinforced concrete
piles reinforced concrete
stay cables steel wire

Chronology

January 2008

Beginning of construction.

June 2010

Expected completion.

Advertisement

Participants

Owner
Design
Architecture
Structural engineering
Engineering
Co-contractor
Stay cables
Prestressing
Formwork & shoring

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20044285
  • Date created
    04/03/2009
  • Last Update
    02/05/2018