• de
  • en
  • fr
  • International Database and Gallery of Structures

Snowden Lift Bridge

General Information

Completion: 1913

Project Type

Structure: Vertical lift bridge
Function / usage: Railroad (railway) bridge
Material: Steel bridge

Location

Location: , , ,

Technical Information

Dimensions

span lengths 3 x 83.9 m + 1 x 90.3 m

Materials

tower steel
truss steel

Chronology

1926

Modified for vehicular traffic

Participants

Design
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000953
  • Date created
    16/09/2000
  • Last Update
    05/02/2016