0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: October 2015
Duration of works: 10 months
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Ybbs
Coordinates: 47° 57' 45.29" N    14° 46' 29.17" E
Show coordinates on a map

Technical Information

Dimensions

span 60 m
walkway width min. 2.600 m

Materials

deck steel
abutments reinforced concrete

Participants

Design
Structural engineering
Checking engineering
Steel construction
Concrete construction

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20074382
  • Published on:
    14/12/2017
  • Last updated on:
    16/12/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine