Robert Schuman Bridge

General Information

Completion: 2014
Duration of works: 19 months
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Saone River
Coordinates: 45° 46' 48.61" N    4° 48' 37.12" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 85-070 m - 84.871 m - 9.047 m
number of spans 3
number of lanes 2 × 2
horizontal navigation clearance 2 × 50 m

Cost

cost of construction Euro 31 000 000

Materials

deck composite steel-reinforced concrete
piers reinforced concrete
arches steel
abutments reinforced concrete

Advertisement

Participants

Architecture
Structural engineering
Construction engineers
Steel construction
Concrete construction
Lifting
Lighting design

Relevant Web Sites

Relevant Publications

  • Sanders, Paul / Stross, Oliver (2016): Design and Construction of Pont Schuman, Lyon. Presented at: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, 19th IABSE Congress Stockholm, 21-23 September 2016, pp. 2397-2406.
  • About this
    data sheet
  • Structure-ID
    20067453
  • Date created
    10/08/2015
  • Last Update
    17/05/2016