General Information
Completion: | 2014 |
---|---|
Duration of works: | 19 months |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Unbraced tied-arch bridge |
Material: |
deck: Steel-reinforced concrete composite bridge Structurae Plus/Pro - Subscribe Now! arches: Steel bridge |
Location
Location: |
Lyon, Rhône (69), Auvergne-Rhône-Alpes, France |
---|---|
Crosses: |
|
Coordinates: | 45° 46' 48.61" N 4° 48' 37.12" E |
Technical Information
Dimensions
span lengths | 85-070 m - 84.871 m - 9.047 m | |
number of spans | 3 | |
number of lanes | 2 x 2 | |
horizontal navigation clearance | 2 x 50 m |
Cost
cost of construction | Euro 31 000 000 |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
piers |
reinforced concrete
|
arches |
steel
|
abutments |
reinforced concrete
|
Participants
Architecture
Structural engineering
- AIA Ingénierie (substructure)
- Flint & Neill (superstructure)
Construction engineers
Steel construction
Concrete construction
Lifting
Lighting design
Relevant Web Sites
Relevant Publications
- (2016): Design and Construction of Pont Schuman, Lyon. Presented at: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, pp. 2406-2415.