0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2014
Duration of works: 19 months
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Saone River
Coordinates: 45° 46' 48.61" N    4° 48' 37.12" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 85-070 m - 84.871 m - 9.047 m
number of spans 3
number of lanes 2 x 2
horizontal navigation clearance 2 x 50 m

Cost

cost of construction Euro 31 000 000

Materials

deck composite steel-reinforced concrete
piers reinforced concrete
arches steel
abutments reinforced concrete

Participants

Architecture
Structural engineering
Construction engineers
Steel construction
Concrete construction
Lifting
Lighting design

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20067453
  • Published on:
    10/08/2015
  • Last updated on:
    17/05/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine