• de
  • en
  • fr
  • International Database and Gallery of Structures

Rehberg Tunnel

General Information

Beginning of works: 2010
Completion: 2013
Status: in use

Project Type

Structure: Tunnel with single lining
Function / usage: High-speed rail tunnel

Location

Location: , , ,
Coordinates: 50° 31' 17.31" N    10° 59' 31.32" E
Coordinates: 50° 30' 57.96" N    10° 59' 34.34" E

Technical Information

Dimensions

length 602 m
number of tracks 2
tunnel section area ca. 160 m²
tunnel portals length 20 m

Quantities

volume of extracted material 117 000 m³

Design Loads

design speed 300 km/h

Participants

Owner

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20064928
  • Date created
    31/03/2013
  • Last Update
    02/01/2017