Advertisement
Share
Follow
Ponte dos Socorridos
General Information
Completion: | 1993 |
---|---|
Status: | in use |
Project Type
Structure: |
Extradosed bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Location
Technical Information
Dimensions
height | 100 m | |
span lengths | 54 m - 85 m - 106 m - 86 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
Relevant Publications
- Concrete box girder bridges by balanced cantilever. Porto Novo Bridge, Alcácer do Sal Bridge, Socorridos Bridge, João Gomes Bridge. Presented at: Bridges — Interaction between construction technology and design, IABSE Symposium, Leningrad, USSR 1991, pp. 300-301. (1991):
- Socorridos bridge: a cable-panel stayed concept. Presented at: Ponts suspendus et à haubans. Cable-stayed and suspension bridges, Deauville, 12.-15.10.1994, pp. 551. :
- Socorridos bridge: a cable-panel stayed concept. Presented at: Ponts suspendus et à haubans. Cable-stayed and suspension bridges, Deauville, 12.-15.10.1994, pp. 343. :
- Tierra sobre el agua. Visión histórica universal de los puentes. Colegio de Ingenieros de Caminos, Canales y Puertos, Madrid (Spain), pp. 525-526. (1999):
- About this
data sheet - Structure-ID
20002309 - Date created
11/11/2001 - Last Update
04/11/2018