Advertisement
Share
Follow
Polcevera Viaduct
General Information
Name in local language: | Viadotto sul Polcevera, "Ponte Morandi" |
---|---|
Beginning of works: | 1962 |
Completion: | 4 September 1967 |
Status: | collapsed (14 August 2018) |
Project Type
Structure: |
Multiple-span cable-stayed bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Genoa, Genova, Liguria, Italy |
---|---|
Address: | A10 |
Part of: | |
Coordinates: | 44° 25' 32.00" N 8° 53' 23.00" E |
Technical Information
Dimensions
deck | deck depth | 4.00 m |
deck width | 18.00 m | |
pylons | pylon height (total) | 100.20 m |
pylon height (above deck) | 45.40 m |
Materials
cables |
prestressed concrete
|
---|---|
deck |
prestressed concrete
|
piers |
reinforced concrete
|
pylons |
reinforced concrete
|
abutments |
reinforced concrete
|
Chronology
14 August 2018 | The westernmost of the three pylons, the one nearest to the river, suddenly collapses in bad weather taking a significant portion of the deck as well as many cars and several trucks traveling across the bridge with it. |
---|
Participants
Relevant Web Sites
Relevant Publications
- . ().
- L'art de l'ingénieur. constructeur, entrepeneur, inventeur. Éditions du Centre Georges Pompidou, Paris (France), pp. 368. (1997):
- Bridges with Multiple Cable-Stayed Spans. In: Structural Engineering International, v. 11, n. 1 (February 2001), pp. 61-82. (2001):
- Cable-Stayed Bridges. Theory and design. Crosby Lockwood Staples, London (United Kingdom), pp. 386. (1977):
- Construcción de puentes de hormigón pretensado, de gran luz, con tirantes homogeneizados. In: Hormigón y acero, v. 24, n. 109 (3rd Quarter 1973), pp. 95-116. (1973):
- About this
data sheet - Structure-ID
20000392 - Date created
09/09/1999 - Last Update
28/11/2018