Paranaiba River Bridge

General Information

Beginning of works: 1995
Completion: 2003
Status: in use

Project Type

Location

Location: , ,
, ,
Crosses:
  • Paranaiba River
Coordinates: 19° 39' 35.00" S    51° 1' 14.83" W
Show coordinates on a map

Technical Information

Dimensions

main span 350 m
total length 636 m
deck width 16.00 m
deck slab thickness 24 - 28 cm
girder depth 1.50 m
pylons height 95.46 m
stay cables on-center distance between stay anchors 10 m

Materials

deck prestressed concrete (B 35)
pylons reinforced concrete (B 40)
stay cables steel wire

Chronology

1978

First Preliminary Design for the Brazilian National Highway Department.

1993
- 1995

Final design for State Higway Department of Minas Gerais.

1995

Construction begins.

1996
- 2000

Construction is interrupted due to lack of funding.

2000

Construction restarts.

11 October 2003

Bridge is opened to traffic.

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20016199
  • Date created
    26/04/2005
  • Last Update
    05/02/2016