• de
  • en
  • fr
  • International Database and Gallery of Structures

New Linz Danube River Bridge

General Information

Beginning of works: November 2017
Completion: 2020
Status: project phase

Project Type

Location

Location: , ,
Crosses:
  • Danube
Replaces: Linz Railroad Bridge (1900)
Coordinates: 48° 19' 1.28" N    14° 17' 44.68" E

Technical Information

Dimensions

width 30.73 m
total length 395.60 m
span lengths 73.10 m - 2 x 112.50 m - 70.50 m - 27 m
number of tracks 2

Quantities

structural steel 8 400 t

Cost

cost of construction Euro 60 000 000

Materials

deck steel
arches steel

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20073512
  • Date created
    30/08/2017
  • Last Update
    19/09/2017