Advertisement

Share

Follow

Donate

Mülmisch Viaduct

General Information

Name in local language: Mülmischtalbrücke
Beginning of works: 1986
Completion: 1988
Status: in use

Project Type

Structure: Box girder bridge
main span:
Deck arch bridge
Function / usage: High-speed rail bridge
Construction method: arch:
In-situ casting on falsework
Material: Prestressed concrete bridge
main span:
Reinforced concrete bridge

Location

Location: , , ,
Part of:
Coordinates: 51° 10' 18.32" N    9° 32' 36.83" E
Show coordinates on a map

Technical Information

Dimensions

total length 870 m
height above valley floor or water 74 m
arch arch span 116 m
deck deck depth 5.3 m
deck width 14 m
number of spans 15
standard span lengths 58 m
piles length max. 33 m

Materials

deck prestressed concrete
piers reinforced concrete
arch reinforced concrete
abutments reinforced concrete

Advertisement

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20010926
  • Date created
    06/12/2003
  • Last Update
    23/04/2018